Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-Finance | ₹2.2 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.4 CrAccepted-Finance | ₹2.4 Cr | L2 | Accepted-Finance L2 |
| 3 | L3₹2.6 CrRejected-Finance | ₹2.6 Cr | L3 | Rejected-Finance l3 |
| 4 | L4₹2.6 CrRejected-Finance | ₹2.6 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹3.0 CrRejected-Finance 29 PEDLIGANJ THANA CANTT GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | ₹3.0 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S BABY SHAHI L2 | M/s AWADH ASSOCIATES L5 | RANJEET SINGH L6 | GARIMA INFRASTRUCTURE L7 | M/s Shrinet Traders L3 | NAGENDRA PRATAP SINGH L9 | M/S PRABHAT TRADERS L1 | SHIV KUMAR MALL L8 | M/s Raja Ram Shukla Contractor L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting with dressing including all lead, lift and T&P etc complete. | 7,014.09 | Cum. | 42.09 ₹2,95,223.05 | 49 ₹3,43,690.41 | 40 ₹2,80,563.6 | 35 ₹2,45,493.15 | 49.85 ₹3,49,652.39 | 68 ₹4,76,958.12 | 30 ₹2,10,422.7 | 69 ₹4,83,972.21 | 70 ₹4,90,986.3 |
| 2.00 | S/L Nylon crates of size 1.00x1.00x1.00m with mesh size 20x20 cm packed with local earth/RBM filled new E.C. bags including all cost of material, labour and T&P etc but excluding cost of earth/RBM. | 3,507 | Cum | 483.67 ₹16,96,230.69 | 669 ₹23,46,183 | 495 ₹17,35,965 | 770 ₹27,00,390 | 575 ₹20,16,525 | 791 ₹27,74,037 | 300 ₹10,52,100 | 750 ₹26,30,250 | 500 ₹17,53,500 |
| 3.00 | S/L Nylon crates of size 1.00x1.00x1.00m With mesh size 20x20 cm packed with earth (carriage earth/RBM upto 1 km) filled new E.C. Bags including all cost of material, labour and T&P etc. | 3,255.81 | Cum. | 593.23 ₹19,31,444.17 | 769 ₹25,03,717.89 | 630 ₹20,51,160.3 | 1,275 ₹41,51,157.75 | 648 ₹21,09,764.88 | 971.25 ₹31,62,205.46 | 300 ₹9,76,743 | 850 ₹27,67,438.5 | 450 ₹14,65,114.5 |
| 4.00 | S/L Geo textile bags in slope pitching made of 200 gsm woven polypropylene Geo textile in size of 1.0 x 0.75 M, filled with R.B.M./Earth sewing by machine including cost of all material labour t&p etc. complete. | 4,115.36 | Cum. | 1,253 ₹51,56,546.08 | 1,819 ₹74,85,839.84 | 1,610 ₹66,25,729.6 | 1,700 ₹69,96,112 | 1,548 ₹63,70,577.28 | 2,053.75 ₹84,51,920.6 | 1,400 ₹57,61,504 | 2,000 ₹82,30,720 | 1,500 ₹61,73,040 |
| 5.00 | S/L Geo textile bags filled with earth, sewing by machine and placing in proper position in P.P. Rope gabion of size 1.80x1.80x0.50 m including cost of all material, labour and T&P etc complete. | 1,684 | Nos. | 2,776 ₹46,74,784 | 3,729 ₹62,79,636 | 3,910 ₹65,84,440 | 3,825 ₹64,41,300 | 1,985 ₹33,42,740 | 4,551 ₹76,63,884 | 2,700 ₹45,46,800 | 4,100 ₹69,04,400 | 2,600 ₹43,78,400 |
| 6.00 | S/L Geo textile bags filled with earth, sewing by machine and placing in proper position in P.P. Rope gabion of size 1.80x1.20x0.50 m including cost of all material, labour and T&P etc complete. | 1,043 | Nos. | 1,893 ₹19,74,399 | 2,599 ₹27,10,757 | 2,710 ₹28,26,530 | 3,060 ₹31,91,580 | 1,668 ₹17,39,724 | 3,101 ₹32,34,343 | 2,000 ₹20,86,000 | 3,000 ₹31,29,000 | 2,000 ₹20,86,000 |
| 7.00 | S/L Geo textile sheet made of 200 gsm woven multifilament below pitching including cost of all material, labour and T&P etc. | 14,654.05 | Sqm | 76 ₹11,13,707.8 | 79 ₹11,57,669.95 | 95 ₹13,92,134.75 | 170 ₹24,91,188.5 | 121 ₹17,73,140.05 | 124 ₹18,17,102.2 | 100 ₹14,65,405 | 101 ₹14,80,059.05 | 100 ₹14,65,405 |
| 8.00 | Providing and laying of Earth over Geo textile sheet in slope pitching including cost of all material, labour and T&P etc. | 1,093.43 | Cum. | 211 ₹2,30,713.73 | 209 ₹2,28,526.87 | 290 ₹3,17,094.7 | 85 ₹92,941.55 | 178 ₹1,94,630.54 | 345 ₹3,77,233.35 | 100 ₹1,09,343 | 300 ₹3,28,029 | 100 ₹1,09,343 |
| 9.00 | S/L RCC Porcupine of size 3.00x3.00x3.00m filled with Jhakhar including cost of all material, labour, T&P and fixing etc in all respect. | 666 | Set | 6,708 ₹44,67,528 | 7,699 ₹51,27,534 | 8,900 ₹59,27,400 | 8,500 ₹56,61,000 | 6,998 ₹46,60,668 | 10,995 ₹73,22,670 | 8,000 ₹53,28,000 | 10,000 ₹66,60,000 | 9,000 ₹59,94,000 |
| 10.00 | Bamboo bracing 50 to 80 mm dia in both side of porcupine including cost of all material, labour and T&P etc. | 15,984 | RM | 80 ₹12,78,720 | 79 ₹12,62,736 | 91 ₹14,54,544 | 85 ₹13,58,640 | 115 ₹18,38,160 | 130 ₹20,77,920 | 20 ₹3,19,680 | 85 ₹13,58,640 | 80 ₹12,78,720 |
Tender Value
Refer Docs
EMD Value
₹7.8 L
Closing Date
26 Mar 2026, 3:00 pmClosed
Superintending Engineer
Superintending Engineer, Gandak Flood Circle, Basti
Anti Erosion work Between Km. 6.600 to Km. 6.900 and Protection work of Village Amariya Tola Sangaldeep Between Km. 8.000 to Km. 8.600 of Bhawari Gayghat Azagara bund on left bank of River Rapti in Distt. Siddharthnagar.
2026_UPIDC_1122380_31
04/SE/2025-26
Open Tender
Civil Works
60 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,274
₹7.8 L
Yes
2 Apr 2026
21 Mar 2026
26 Mar 2026
21 Mar 2026
26 Mar 2026
21 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in cutting with dressing including all lead, lift and T&P etc complete. | |||||
| 2S/L Nylon crates of size 1.00x1.00x1.00m with mesh size 20x20 cm packed with local earth/RBM filled new E.C. bags including all cost of material, labour and T&P etc but excluding cost of earth/RBM. | |||||
| 3S/L Nylon crates of size 1.00x1.00x1.00m With mesh size 20x20 cm packed with earth (carriage earth/RBM upto 1 km) filled new E.C. Bags including all cost of material, labour and T&P etc. | |||||
| 4S/L Geo textile bags in slope pitching made of 200 gsm woven polypropylene Geo textile in size of 1.0 x 0.75 M, filled with R.B.M./Earth sewing by machine including cost of all material labour t&p etc. complete. | |||||
| 5S/L Geo textile bags filled with earth, sewing by machine and placing in proper position in P.P. Rope gabion of size 1.80x1.80x0.50 m including cost of all material, labour and T&P etc complete. | |||||
| 6S/L Geo textile bags filled with earth, sewing by machine and placing in proper position in P.P. Rope gabion of size 1.80x1.20x0.50 m including cost of all material, labour and T&P etc complete. | |||||
| 7S/L Geo textile sheet made of 200 gsm woven multifilament below pitching including cost of all material, labour and T&P etc. | |||||
| 8Providing and laying of Earth over Geo textile sheet in slope pitching including cost of all material, labour and T&P etc. | |||||
| 9S/L RCC Porcupine of size 3.00x3.00x3.00m filled with Jhakhar including cost of all material, labour, T&P and fixing etc in all respect. | |||||
| 10Bamboo bracing 50 to 80 mm dia in both side of porcupine including cost of all material, labour and T&P etc. | |||||
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.70 MB
Lot_14.pdf
Tender Documents • 1.95 MB
BOQ_2105379.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid