Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-Finance | ₹9.4 L | L1 | Accepted-Finance L1 |
| 2 | L1₹9.4 LRejected-Finance | ₹9.4 L | L1 | Rejected-Finance Since multiple tenders were tied, after recommendation of lowest agency (L1) by Ex.Engineer, proposal was submitted for prior approval of Honble Min. (PWD) and the same has been approved |
Tender Value
₹11.8 L
EMD Value
₹23,515
Closing Date
13 Feb 2026, 4:00 pmClosed
Executive Engineer
Office of Executive Engineer, Div IV, PWD Tonca
Servicing and maintenance of Air Conditioner units under the jurisdiction of sub division III, work division IV in Panaji-Goa for the period of one year.
2026_PWD_27599_1
31/1/2025-26/ASW-IV/EMN/PWD/50 LINE04
Open Tender
Electrical Works
365 days
Tonca Caranzalem
Please refer to tender notice
3 documents required · 3 mandatory
₹5,000
Yes
₹23,515
Yes
30 Jun 2026
5 Feb 2026
16 Feb 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Servicing of window AC’s of all makes and tonnages including replacement of different types of capacitors, relays, thermostat, overload protector, selector switches etc. | 12 | Nos | 650 | ₹7,800 |
| 2 | Servicing of split AC’s of all makes and tonnages including replacement of different types of capacitors, relays, thermostat, overload protector, selector switches etc | 660 | Nos | 750 | ₹4,95,000 |
| 3 | Replacement of defective compressor by newcompressor suitable for 1.5 ton split AC . | 15 | Nos | 8,000 | ₹1,20,000 |
| 4 | Re-Installation of 1/1.5/2.0TR split AC as and when required. | 15 | Nos | 2,500 | ₹37,500 |
| 5 | Deployment of one qualified AC technician along with the required tools and plants during normal working hours, as and when required, at Sub Division III, Works Division IV, Tonca-Caranzalem. | 30 | Days | 800 | ₹24,000 |
| 6 | Supply installation testing and comissioning of 4 KVA Voltage stabilizer of (Everest / V -Guard make) | 15 | Each | 2,300 | ₹34,500 |
| 7 | Supply installation testing and comissioning of 5 KVA Voltage stabilizer of (Everest / V -Guard make) | 15 | Each | 2,530 | ₹37,950 |
| 8 | Repair of PCB for split air conditioner of all kinds and tonnages | 15 | Nos | 1,000 | ₹15,000 |
| 9 | Supply and installation of new PCB for 1.5 TR split AC | 15 | Nos | 2,800 | ₹42,000 |
| 10 | Attending to emergency breakdown calls apart from servicing schedule as and when required | 105 | Nos | 800 | ₹84,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 7.69 MB
BOQ_28045.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid