Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.3 L
EMD Value
₹1,500
Closing Date
27 Jan 2020, 4:00 pmClosed
SE ETC I Lucknow
Pareshan Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow
Work of 4 times grass cutting and uprooting of various types of trees at 132 KV Ss Haidergarh under ETD III Lucknow
2020_UPTCL_424156_1
E-tender 127/2019-20
Open Tender
Miscellaneous Works
Piece-work
365 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹1,500
31 Jan 2020
15 Jan 2020
28 Jan 2020
15 Jan 2020
27 Jan 2020
15 Jan 2020
Amount
1) Clearance of dense Jungle and Cutting of Grass, Kusha & Kansa including Uprooting of the Rank Vegetation, Grass, Bushes, Shrubs etc. by Scrapping of Grass, Bush Wood & Plants etc. above 2" over the ground level; Weeding out the wild growth Roots, Seeds etc. and collection of the foreign materials like Kankar, Ballast, Pebbles, Waste Papers etc. in Switchyard Area including Area between Pale Fencing & Chain Link Fencing, Area between Pale / Chain Link Fencing & Security Fencing / Security Wall, Area around Control Room / Committee Room / Store Sheds and Openyard Store Area at 132 KV Substation Haidergarh, then Disposal of all the removed Vegetation, Rubbish & Garbage etc. by throwing it outside the Periphery of the Sub Station Premises, with all cost of men, misc. consumables and T&P etc. required for the job, as per details below :
a) First Cutting between 1st Feb 2020 to 29th Feb 2020
b) Second Cutting between 1st May 2020 to 31th May 2020
c) Third Cutting between 1st Aug 2020 to 31th Aug 2020
d) Fourth Cutting between 1st Nov 2020 to 30th Nov 2020.
2) One Time Spraying of ‘Round Up’ / ‘Glycel’ Herbicide liquid and Ammonium Sulphate Crystal mixture by diluting it with water in the ratio of 1:60 with the help of manual operated Spraying Machine on the Grass / wild growth / Plants in Switchyard Area including Area between Pale Fencing & Chain Link Fencing, Area between Pale / Chain Link Fencing & Security Fencing / Security Wall, Area around Control Room / Committee Room / Store Sheds and Openyard Store Area at 132 KV Substation Haidergarh, 30 Days before Third Cutting in the Month of Juky 2020, with all cost of men, material including Herbicide mixture, misc. consumables and T&P etc. required for the job.
3) Uprooting of small wild Trees in Switchyard Area including Area between Pale Fencing & Chain Link Fencing, Area between Pale / Chain Link Fencing & Security Fencing / Security Wall, Area around Control Room / Committee Room / Store Sheds and Openyard Store Area at the Sub Station by digging and taking out the complete Root, then disposal of all the removed Vegetation, Rubbish & Garbage etc. by throwing it outside the Periphery of Sub Station Haidergarh Premises and finally, leveling the ground, with all cost of men, misc. consumables and T&P etc. required for the job, as per details below :
a) First Uprooting between 1st Feb 2020 to 29th Feb 2020
b) Second Uprooting between 1st May 2020 to 31th May 2020
c) Third Uprooting between 1st Aug 2020 to 31th Aug 2020
d) Fourth Uprooting between 1st Nov 2020 to 30th Nov 2020.
PANKHURI ENTERPRISES
M/S MAA VAISHNO AGENCIES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .