Loading…
Loading…
Tender Value
₹37.0 L
EMD Value
₹3.7 L
Closing Date
16 Jul 2026, 5:00 pm
Executive Officer
Nagar palika parishad khurja
Navdurga shakti mandir se Aligarh chungi tak central verge and plantation ka karya.
2026_DOLBU_1164054_1
460 date 25-06-2026 work-12
Open Tender
Civil Works
120 days
Nagar palika parishad khurja
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,365
Executive Officer
₹3.7 L
26 Jun 2026
26 Jun 2026
17 Jul 2026
26 Jun 2026
16 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sub head & detail of work | |||||
| 1.01 | Dismentalling of old brick work devider and disposal waste from site including all. SI NO-691 | 168.75 | m3@(mailto:m3@塹ᴻ䡿ⲯ嶂藄挧ꮥ) | - | - |
| 1.02 | Dismentalling of old cc work devider and disposal waste from site including all. | 41.4 | m3@(mailto:m3@塹ᴻ䡿ⲯ嶂藄挧ꮥ) | - | - |
| 1.03 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm.layers including ramming and dressing the surface to required levels and slopesand also including lift upto 1.5 metre (5fts) lifts and lead upto 30 m.including all materials,labour,T&P and machinary plant as per direction of engineer in charge including all type of taxes,cess ,toll etc but excluding G.S.T. SI. No. 253 A + 260(a)+261(b)+261(c) (D=0.80+2.50/2=1.65) | 148.5 | m3@(mailto:m3@塹ᴻ䡿ⲯ嶂藄挧ꮥ) | - | - |
| 1.04 | Cement concrete with 4cm gauge approved stone ballast, approved coarse sand and cement in the proportion of 1:4:8 including supply of all materails, labour and T&P etc. required for proper completion of the work. As per S.I. No. 281 | 27 | m3@(mailto:m3@塹ᴻ䡿ⲯ嶂藄挧ꮥ) | - | - |
| 1.05 | R.C.C. work with cement approved coarse sand and 2 cm gauge approved stone grit/shingle in proportion of 1:1½:3 in slabs excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour and T&P etc. required for proper completion of work. Including cost of Binding wire. (S.I. No. 287A) .including all materials,labour,T&P and machinary plant as per direction of engineer in charge including all texes but excluding G.S.T. D=(0.60+2.00)/2=1.30 | 99 | m3@(mailto:m3@塹ᴻ䡿ⲯ嶂藄挧ꮥ) | - | - |
| 2 | M.S. (tor steel or plain) in plain work such as R.C.C. or R.B. work including bending for proper shape as necessary including bending for proper completion of the work and including supply of all steel & wastage, bend, hooks and authorised overlapping shall be measured. including all type of taxes,cess ,toll etc but excluding G.S.T. | 58.29 | m3@(mailto:m3@塹ᴻ䡿ⲯ嶂藄挧ꮥ) | - | - |
| 3 | Supply and laying 100mm dia pvc pipe for all cables including with all materials all. | 300 | m3@(mailto:m3@塹ᴻ䡿ⲯ嶂藄挧ꮥ) | - | - |
| 4 | Making junction for electrification work including all. | 10 | m3@(mailto:m3@塹ᴻ䡿ⲯ嶂藄挧ꮥ) | - | - |
| 5 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm.layers including ramming and dressing the surface to required levels and slopesand also including lift upto 1.5 metre (5fts) lifts and lead upto 30 m.including all materials,labour,T&P and machinary plant as per direction of engineer in charge including all type of taxes,cess ,toll etc but excluding G.S.T. SI. No. 253 A + 260(a)+261(b)+261(c) (D=0.80+2.50/2=1.65) | 148.5 | m3@(mailto:m3@塹ᴻ䡿ⲯ嶂藄挧ꮥ) | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_2182499.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid