Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC | L1 | Accepted-AOC L1 Biddder | |
| 2 | L2₹42.6 L+₹18.6 L (77.3%)Rejected-Finance | L2 | Rejected-Finance Not L1 Bidder | |
| 3 | L3₹47.0 L+₹22.9 L (95.2%)Rejected-Finance 9B CLIVE ROAD CIVIL LINE ALLAHABAD UTTAR PRADESH 211002 SUNROVER PVT LTD CLIVE ROAD CIVIL LINES ALLAHABAD UTTAR PRADESH 211002 | PRAYAGRAJ | UTTAR PRADESH | 211002 | L3 | Rejected-Finance Not L1 Bidder | |
| 4 | Rejected-Technical 144 DDA FLAT KONDLI GHAROLI MAYUR VIHAR III EAST DELHI DELHI 110096 | EAST DELHI | DELHI | 110096 | - | Rejected-Technical Disqualified | |
| 5 | Rejected-Technical | - | Rejected-Technical Disqualified |
Tender Value
Refer Docs
EMD Value
₹84,000
Closing Date
1 Apr 2024, 3:00 pmClosed
BUH HURL GORAKHPUR
HURL GORAKHPUR
Procurement of All in One 35W Solar Street light at HURL, GKP
2024_HURL_801940_1
H/G/CNM/23-24/P-777/TE-927
Open Tender
Miscellaneous Goods
Supply
30 days
HURL GORAKHPUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹84,000
Yes
22 Aug 2024
22 Mar 2024
2 Apr 2024
22 Mar 2024
1 Apr 2024
22 Mar 2024
Amount
All in One 35W Solar Street light
All in One 35-Watt solar street light with Pole: PV Panel: Mono crystalline, Rating: 100Wp, Battery:12.8V, AH:36AH capacity Lithium Ferro Phosphate battery, the battery pack should have a proper Battery management System' (BMS) for cell balancing, overcharge and over temperature protection, MPPT Integral Charge controller inbuilt with Street light, Light Source:35-Watt, W- LED luminaire LED Chip should be compliance with IES: LM-80 W-LED should not ultraviolet light. The light output from the white LED light source should be constant throughout the duty cycle. The temperature of the heat sink should not increase more than 20ºC above ambient temperature during the dusk to dawn operation, Light O/P:Lumen:4900,rated Colour Temp:5500-6500K,CRI:80,Luminus Efficacy:150Lm/W, Dimmed Intencity:90 Lm/W time based with 36Hr back ,Additionally protection against Shrot Circuit ,reverse polarity, Battery over charger/deep discharge need to be provided, Pole luminaire Height: Minimum 4.5M above ground foundation including excavation & refilling etc. and up 6.0Mtr.,Lghting pole shall be steel tubular conforming to designation 410 SP-3 as per IS:2713 complete with base plate, threaded stud with nuts & washers for earthing, finial taper plug, bracket on the overhang portion for fixing of lighting fixtures bolts, nuts and screws as required shall be provided and Thickness of galvanizing (min. 80 microns) Average illuminance shall comply with IS 1944 as may be applicable ,maintenance Factor:0.9,Luminair shall be tested for type test as specified in IS 10322 part 5 sec 3 or IEC60598-2-3 standered,IP65
Erection of Metallic Pole
Earthing with GI Earth pipe 4.5 Meter
Roshni solar consultancy
SUNROVER PVT LTD
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .