Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.2 LAdmitted-Finance PLOT NO 41 SECTOR D BAGRODA INDUSTRIAL AREA BHOPAL MP 462026 | BHOPAL | MADHYA PRADESH | 462026 | ₹48.2 L | L1 | Admitted-Finance |
| 2 | L2₹54.6 L+₹6.4 L (13.3%)Admitted-Finance K 4 FIVE STAR INDUSTRIAL AREA MIDC BUTIBORI NAGPUR 441 122 | NAGPUR | NAGPUR | MAHARASHTRA | 441122 | ₹54.6 L+₹6.4 L (13.3%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical PARALI V | PARBHANI | MAHARASHTRA | 431401 | - | - | Rejected-Technical Non submission of PQR document as per NIT clause no 5d |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non submission of PQR document as per NIT clause no 5b |
| Sl No | Description | Qty | Unit | UNITED ENGINEERING L1 | EM Services (I) Pvt. Ltd. L2 |
|---|---|---|---|---|---|
| 1.00 | Refurbishment of Economizer Top Bank Module:-
Size: 38.1x5.3, Length :-13.5 meter, Weight 1.5 Ton, No of tubes in one module - 24
(as per scope of work) | 35 | Nos | 13,30,000 ₹15,69,400 Lowest | 15,22,500 ₹17,96,550 |
| 2.00 | Refurbishment of Economizer Middle Bank Module:-
Size: 38.1x5.3, Length :-13.5 meter, Weight 4.5 Ton, No. of tubes in one module - 66
(as per scope of work) | 16 | Nos | 8,32,000 ₹9,81,760 Lowest | 9,34,400 ₹11,02,592 |
| 3.00 | Refurbishment of Economizer Bottom Bank Module:-
Size: 38.1x5.3, Length :-13.5 meter, Weight 2.5 Ton, No. of tubes in one module - 42
(as per scope of work) | 16 | Nos | 7,20,000 ₹8,49,600 Lowest | 8,68,800 ₹10,25,184 |
| 4.00 | High Pressure Weld Joints (as per scope of work) | 500 | Nos | 12,00,000 ₹14,16,000 Lowest | 13,00,000 ₹15,34,000 |
Tender Value
₹50.5 L
EMD Value
₹1.0 L
Closing Date
29 Jun 2026, 3:00 pmClosed
SE(PNW) SGTPS
SE(PNW) SGTPS Birsinghpur
Work Contract for Inspection and repairing refurbishment of old economizer coil modules of 1X500 MW unit at SGTPS, MPPGCL, Birsinghpur.
2026_MPPGC_496781_1
496781
Open Tender
Miscellaneous Works
Fixed-rate
90 days
SGTPS, BIRSINGHPUR
As per NIT
17 documents required · 17 mandatory
₹2,000
Yes
₹1.0 L
Yes
27 Jul 2026
16 May 2026
1 Jul 2026
16 May 2026
29 Jun 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Refurbishment of Economizer Top Bank Module:-
Size: 38.1x5.3, Length :-13.5 meter, Weight 1.5 Ton, No of tubes in one module - 24
(as per scope of work) | 35 | Nos | -4 | - |
| 2 | Refurbishment of Economizer Middle Bank Module:-
Size: 38.1x5.3, Length :-13.5 meter, Weight 4.5 Ton, No. of tubes in one module - 66
(as per scope of work) | 16 | Nos | -4 | - |
| 3 | Refurbishment of Economizer Bottom Bank Module:-
Size: 38.1x5.3, Length :-13.5 meter, Weight 2.5 Ton, No. of tubes in one module - 42
(as per scope of work) | 16 | Nos | -4 | - |
| 4 | High Pressure Weld Joints (as per scope of work) | 500 | Nos | -4 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.68 MB
CompleteSBD2.pdf
Tender Documents • 14.30 MB
tenderschedule496781.pdf
Tender Documents • 0.32 MB
checklist469792.pdf
Tender Documents • 0.34 MB
BOQ_612160.xls
BOQ • 0.28 MB
Technicalbid496781.xls
Additional Documents • 1.48 MB
CriteriaForJV.pdf
Additional Documents • 0.19 MB
ContactDetails.xls
Additional Documents • 0.03 MB
1276.pdf
PDF • 0.65 MB
1160.pdf
PDF • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .