GEMC-511687773185986
Awarded to S.M SUPPLIERS
₹2.5 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Earth work in excavation by manual means in Trench for foundations drains | Earth Work In Excavation By Manual Means In Trench For Foundations Drains | 9954 | 2 cum | 1,078 | 2,156 |
| PL stone sollingdry handpicked at the bottom offoundation incl.Ramming watering all complete job | PL Stone Sollingdry Handpicked At The Bottom Offoundation Incl.Ramming Watering All Complete Job | 3101 | 2 cum | 860 | 1,720 |
| PL cement conc | PL Cement Conc | 3101 | 2 cum | 8,838 | 17,676 |
| Form work centring and shuttering of walls of ordinary ply | Form Work Centring And Shuttering Of Walls Of Ordinary Ply | 3101 | 40 sqm | 524 | 20,960 |
| PL fixing of iron pipes for roofing allcomplete job | PL Fixing Of Iron Pipes For Roofing Allcomplete Job | 3101 | 140 qtl | 200 | 28,000 |
| PL cement conc M 10 Gd | PL Cement Conc M 10 Gd | 3101 | 6 cum | 9,806 | 58,836 |
| plastering on inside and out side of structure with neat cement coating on flooring wall | Plastering On Inside And Out Side Of Structure With Neat Cement Coating On Flooring Wall | 3101 | 57 sqm | 520 | 29,640 |
| providingf f of iron structure | Providingf F Of Iron Structure | 3101 | 3 qtl | 18,570 | 55,710 |
| Add cost of CGI sheets inch fixing and cost of nails | Add Cost Of CGI Sheets Inch Fixing And Cost Of Nails | 3101 | 1 qtl | 28,000 | 28,000 |
| Carriage of material by mech | Carriage Of Material By Mech | 3101 | 2 ton | 3,600 | 7,200 |