Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-Finance | ₹3.6 L | L1 | Accepted-Finance LOWEST BIDDER |
| 2 | L2₹4.8 LRejected-Finance | ₹4.8 L | L2 | Rejected-Finance NOT LOWEST BIDDER |
| 3 | L3₹4.8 LRejected-Finance | ₹4.8 L | L3 | Rejected-Finance NOT LOWEST BIDDER |
| 4 | L4₹4.8 LRejected-Finance | ₹4.8 L | L4 | Rejected-Finance NOT LOWEST BIDDER |
| 5 | Rejected-Technical SOUTH CANAL ELECTRICAL MECHANICAL SUB DIVISION BOLPUR BIRBHUM | BOLPUR | BIRBHUM | WEST BENGAL | - | - | Rejected-Technical Not similar nature of work |
Tender Value
₹4.9 L
EMD Value
₹9,708
Closing Date
27 Mar 2026, 3:00 pmClosed
EE,MNCD
RAMPURHAT NISCHINTAPUR BIRBHUM
Repair of embankment inbetween Ch. 75.00 near Road Bridge and Ch. 108.00 near Cross Regulator over Left bank of DBMC of Borobataspur (I) Section of Mouza- Kabindnagar, GP- Digalgram, Block and PS-Md. Bazar and Dist.-Birbhum under M.N.C. Division dur
2026_IWD_1022546_2
e-N.I.T No - WBIW/EE/MNCD/NIT-11(e)/2025-26
Open Tender
CIVIL WORKS
30 days
MOLLARPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,708
Yes
17 Apr 2026
18 Mar 2026
30 Mar 2026
18 Mar 2026
27 Mar 2026
18 Mar 2026
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing,sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. B) Beyond 1.00 km and upto 2.00 km
Compatibility Report for V3_BOQ_Percentage_Template.xls
Run on 5/19/2015 15:29
The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format.
Significant loss of functionality
Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear clipped.
'BoQ1'!A1:II19
Minor loss of fidelity
Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned.
stage.html
html • 0.05 MB
technical_2513112.pdf
techsummary_2513112.pdf
finance_2513112.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_2513112.xls
BOQ • 0.28 MB
Barchart2.pdf
Tender Documents • 0.43 MB
2911.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid