| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Finance 0 DHARAMBUGH KRALPORA BAGI MEHTAB B K PORA BUDGAM JAMMU KASHMIR 190019 | SRINAGAR | JAMMU AND KASHMIR | 190019 | L1 | Admitted-Finance | |
| 2 | L2₹8.0 L+₹31,430 (4.10%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹8.3 L+₹63,080 (8.23%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹8.5 L+₹82,380 (10.7%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹8.6 L+₹91,395 (11.9%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s F M Infratech India Private Limited L5 | AYMAN ELECTRIC SUPPLIERS L3 | M/S QADRI ELECTRICALS L2 | MIR IRFAN ELECTRICAL/SUPPLIERS L1 | M/s Intel Technocrates L6 | Max Marketing L7 | IRSHAD AHMAD LONE L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Supply, installation, testing and commissioning of 100 KVA DTR 11/6.6/.433 KV Level-2 (Double Ratio) | 1 | No. | 1,88,499 ₹1,88,499 | 1,80,000 ₹1,80,000 Lowest | 1,80,000 ₹1,80,000 Lowest | 2,05,000 ₹2,05,000 | 1,90,000 ₹1,90,000 | 2,00,000 ₹2,00,000 | 2,00,000 ₹2,00,000 |
| 1.02 | Supply, installation, testing and commissioning of 9 Mtr. Long Pole(ST-410 SP33) | 10 | No | 1,81,990 ₹1,81,990 | 1,40,000 ₹1,40,000 Lowest | 1,40,000 ₹1,40,000 Lowest | 1,41,000 ₹1,41,000 | 1,60,000 ₹1,60,000 | 1,85,000 ₹1,85,000 | 1,68,000 ₹1,68,000 |
| 1.03 | Supply, installation, testing and commissioning of 8 Mtr. Long ST pole SP-15 | 3 | No | 48,597 ₹48,597 | 36,000 ₹36,000 | 33,000 ₹33,000 | 21,300 ₹21,300 Lowest | 42,000 ₹42,000 | 45,000 ₹45,000 | 38,400 ₹38,400 |
| 1.04 | Supply, installation, testing and commissioning of 0.05 ACSR Conductor | 3 | Km | 1,50,597 ₹1,50,597 | 1,80,000 ₹1,80,000 | 1,65,000 ₹1,65,000 | 1,05,000 ₹1,05,000 Lowest | 1,65,000 ₹1,65,000 | 1,95,000 ₹1,95,000 | 1,65,000 ₹1,65,000 |
| 1.05 | Supply, installation, testing and commissioning of 35 mm² AB (HT) Cable (3x35+1x70 insulated) mm² XLPE (11 kV, 3C + Earth) | 100 | Mtr | 44,900 ₹44,900 Lowest | 70,000 ₹70,000 | 60,000 ₹60,000 | 55,000 ₹55,000 | 90,000 ₹90,000 | 67,000 ₹67,000 | 63,000 ₹63,000 |
| 1.06 | Supply, installation, testing and commissioning of Heat Shrinkable Outdoor Cable Termination Kit | 2 | No | 9,198 ₹9,198 | 5,000 ₹5,000 Lowest | 6,000 ₹6,000 | 10,000 ₹10,000 | 12,000 ₹12,000 | 8,000 ₹8,000 | 5,000 ₹5,000 Lowest |
| 1.07 | Supply, installation, testing and commissioning of Suspension/Tension Clamp with eye hook | 6 | No | 2,994 ₹2,994 | 2,700 ₹2,700 | 2,400 ₹2,400 | 600 ₹600 Lowest | 1,800 ₹1,800 | 3,000 ₹3,000 | 1,200 ₹1,200 |
| 1.08 | Providing and fixing of GI Channel (100x50x6mm) 9Ft 2 No, (75x40x6mm) 9 Feet Long (8 No), (75x40x6mm) 5.5 Ft long (8 No) and GI Angle (50x50x6mm) 5.5 Feet Long (8 No) with back clamps and V-Cross Arm with F-Top and Back Clamps (2No) | 350 | Kgs | 45,500 ₹45,500 | 45,500 ₹45,500 | 43,750 ₹43,750 Lowest | 73,500 ₹73,500 | 52,500 ₹52,500 | 54,250 ₹54,250 | 49,000 ₹49,000 |
| 1.09 | Supply, installation, testing and commissioning of 185 mm² XLPE LT Cable Single Core, | 60 | Mts | 32,940 ₹32,940 | 21,000 ₹21,000 Lowest | 24,000 ₹24,000 | 22,800 ₹22,800 | 22,800 ₹22,800 | 23,400 ₹23,400 | 25,500 ₹25,500 |
| 1.10 | Supply, installation, testing and commissioning of LT Distribution Box for 100 KVA with MCCB 160 Amps 3 Pole for incommer and 100 Amp MCCB 3 Pole 2 No's for Outgoing Circuits | 1 | No | 40,499 ₹40,499 | 30,000 ₹30,000 | 25,000 ₹25,000 Lowest | 35,000 ₹35,000 | 45,000 ₹45,000 | 25,000 ₹25,000 Lowest | 35,000 ₹35,000 |
Tender Value
₹10.3 L
EMD Value
₹20,600
Closing Date
21 Aug 2025, 4:00 pmClosed
Executive Engineer ED I
Office of Ex Engineer EDI Basantbagh
Creation of 100 KVA Substation along with HT LT network for Stabilization of Power system network at Kongposh Colony Zawoora Khunmoh
2025_PDD_282899_1
E NIT NO 012 OF ED-I
Open Tender
Electrical and Maintenance Works
Lump-sum
25 days
Office of Executive Engineer ED I
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Yes
Executive Engineer ED I
₹20,600
Yes
2 Sept 2025
31 Jul 2025
22 Aug 2025
31 Jul 2025
21 Aug 2025
31 Jul 2025
31 Jul 2025 - 2 Aug 2025
Supply, installation, testing and commissioning of 100 KVA DTR 11/6.6/.433 KV Level-2 (Double Ratio)
Supply, installation, testing and commissioning of 9 Mtr. Long Pole(ST-410 SP33)
Supply, installation, testing and commissioning of 8 Mtr. Long ST pole SP-15
Supply, installation, testing and commissioning of 0.05 ACSR Conductor
Supply, installation, testing and commissioning of 35 mm² AB (HT) Cable (3x35+1x70 insulated) mm² XLPE (11 kV, 3C + Earth)
Supply, installation, testing and commissioning of Heat Shrinkable Outdoor Cable Termination Kit
Supply, installation, testing and commissioning of Suspension/Tension Clamp with eye hook
Providing and fixing of GI Channel (100x50x6mm) 9Ft 2 No, (75x40x6mm) 9 Feet Long (8 No), (75x40x6mm) 5.5 Ft long (8 No) and GI Angle (50x50x6mm) 5.5 Feet Long (8 No) with back clamps and V-Cross Arm with F-Top and Back Clamps (2No)
Supply, installation, testing and commissioning of 185 mm² XLPE LT Cable Single Core,
Supply, installation, testing and commissioning of LT Distribution Box for 100 KVA with MCCB 160 Amps 3 Pole for incommer and 100 Amp MCCB 3 Pole 2 No's for Outgoing Circuits
Supply, installation, testing and commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
Supply, installation, testing and commissioning of 11KV Horn Gap Fuse 200 A
Supply, installation, testing and commissioning of 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Supply, installation, testing and commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Supply, installation, testing and commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with fitting
Supply, installation, testing and commissioning of LT Muki Clamp with Shackle Insulator including Bolts
Providing and fixing of Galvanized Nuts and Bolts of sizes
Providing and fixing of Pole Earthing using Spike Rod 20mm,2.5 Mt Long through GI strip 25x3mm
Providing and fixing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Supply, installation, testing and commissioning of 11KV Danger Board
Supply, installation, testing and commissioning of Anti Climbing Devices
Supply, installation, testing and commissioning of Al SL Clamps
Supply, installation, testing and commissioning of Al Lugs of Sizes
Painting of poles with Al. Paint (2 Coat)
Painting of poles with of Red Oxide(1 Coat)
Providing and laying of Cement bottoming 1:2:4 mix 9 Mt ST Poles (0.48 cum/pole)
Providing and laying of Cement bottoming 1:2:4 mix 8 Mt ST Poles (0.40 cum/pole)
M/S QADRI ELECTRICALS (BID ID -2446655)
AYMAN ELECTRIC SUPPLIERS (BID ID -2444786)
IRSHAD AHMAD LONE (BID ID -2449507)
M/s F M Infratech India Private Limited (BID ID -2444423)
M/s Intel Technocrates (BID ID -2450416)
Max Marketing (BID ID -2446959)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .