Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.3 Cr+₹18.3 L (5.80%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.3 Cr+₹18.6 L (5.90%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical As per the decision of Tender Evaluation Committee |
Tender Value
₹3.3 Cr
EMD Value
₹3.3 L
Closing Date
17 Sept 2026, 5:00 pmClosed
C.C.E, Northern R AND B Circle, SAMBALPUR
O/O THE C.C.E, Northern R AND B Circle, SAMBALPUR
BUILDING WORK
2026_EICCL_139880_1
CCENC (R AND B) /04/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
210 days
Jharsuguda
4 documents required · 4 mandatory
₹10,000
₹3.3 L
Yes
28 Sept 2026
1 Sept 2026
18 Sept 2026
1 Sept 2026
17 Sept 2026
1 Sept 2026
1 Sept 2026 - 7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or gravelly soil with 50m. initial lead and 1.5m.initial lift including rough dressing and breaking clods to maximum 5cm. to 7cm. and laying in layers not exceeding 0.3m. in depth and as per the direction of the Engineer-in-charge. | 513.75 | cum | 282.89 | ₹1,45,334.74 |
| 2 | Providing Antitermite treatments as per ISI specification including making holes 3'0" C/C both ways injecting chemical with water in propertion(1:20) or any approved propertion by the EIC & treatment to choukath sides & wall junction. Cost & conveyance of all materials, labours, T&P etc complete. as per direction of EIC. | 346.42 | sqm | 104.5 | ₹36,200.89 |
| 3 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. In depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. (Measurement will be taken on finished compacted section only). | 427.17 | cum | 587.14 | ₹2,50,808.59 |
| 4 | Providing and lying plain cement concrete of proportion (1:3:6) in foundation and floors using Portland slag cement (PSC) with 40 mm. Size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties and taxes all materials and cost all labours, sundries, T & P required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump complete as per the instruction of the Engineer-in-Charge. | 83.6 | cum | 6,017.33 | ₹5,03,048.79 |
| 5 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position.
plinth beam | 2.22 | cum | 7,644.7 | ₹16,971.23 |
| 6 | lintel | 1.07 | cum | 14,484.2 | ₹15,498.09 |
| 7 | Chajja | 8.73 | sqm | 1,261.8 | ₹11,015.51 |
| 8 | Shelves | 2.23 | sqm | 1,162.9 | ₹2,593.27 |
| 9 | Beam | 4.65 | cum | 18,592.7 | ₹86,456.06 |
| 10 | Column in Super structure | 1.78 | cum | 18,592.7 | ₹33,095.01 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.70 MB
Tendernotice_2.pdf
PDF • 1.56 MB
Tendernotice_1.pdf
PDF • 3.77 MB
BOQ_607790.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .