Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹53.7 LAdmitted-Finance | -5.11% | ₹53.7 L | L1 | Admitted-Finance |
| 2 | L2₹55.4 LAdmitted-Finance | -2.00% | ₹55.4 L | L2 | Admitted-Finance |
Tender Value
₹56.6 L
EMD Value
₹1.1 L
Closing Date
24 May 2026, 6:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, PWD, ELECTRICAL CIRCLE-II
Annual Operation and Maintenance Of 33/11 KV SubStation At Rajasthan Secretariat, Jaipur
2026_CEPWD_560235_3
EESectt_nit_03_26-27
Open Tender
Electrical Works
300 days
Electric work/EESECTT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EESECTT/MDRISL
₹1.1 L
Yes
SUPERINTENDING ENGINEER, PWD, ELECTRICAL CIRCLE-II
30 May 2026
19 May 2026
25 May 2026
19 May 2026
24 May 2026
19 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1All in all comprehensive maintenance of 11/0.415 KV or 33/0.415 KV Distribution sub station including 11 KV circuit Breaker , Transformer and its complete accessories , Auto transfer switch ,repairing of LT/HT cables with terminations, LT panel with complete accessories , Sub station Earthings etc with maintaining of Log Books complete in all respect but excluding of transformer oil as and when required. | |||||
| 1.1 | Substation Up to 500 KVA rating Transformer | - | Job per KVA per Month | - | - |
| 2Substation Above 500 KVA Transformer | |||||
| 2.1 | Substation with 33/11 KV Transformer | - | Job per KVA per Month | - | - |
| 2.2 | All in all comprehensive maintenance including servicing , replacement of fuel - filter, coolant , lubricating oil etc of Diesel Generating set including auto mains failure (AMF) panel , change over switch , earthing etc as per OEM guidelines and maintenance manual complete in all respet. (Excluding replacement of batteries as and when required.) | - | - | - | - |
| 2.3 | Above 62.5 KVA | - | Job per KVA per Month | - | - |
| 2.4 | All in all comprehensive maintenance of Automatic power factor correction panel including repair / replacement of defective componenets to maintain the power factor as per Discom's permissible limit and without any penalty or surcharge. | - | - | - | - |
| 2.5 | Above 125 kvar APFC Panels | - | Job per KVAR per Month | - | - |
| 2.6 | Providing Manpower through Contracting agency for Supervision / Execution / Operation of various Electromechanical Installations. (one shift of 8 working Hrs per day for 26 Working Days in a month) on basis of minimum wages + VDA order Dt. 28.03.2025 Ministry of Labour and Employement Govt. of India | - | - | - | - |
| 2.7 | Engineer with B.Tech and1 Yrs, experience ,/Diploma Engineer with 3 Yrs. Experience in relevant field | - | Each Per Month | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.72 MB
Tendernotice_2.pdf
PDF • 0.14 MB
Tendernotice_3.pdf
PDF • 1.46 MB
Tendernotice_4.pdf
PDF • 0.39 MB
Tendernotice_5.pdf
PDF • 0.61 MB
BOQ_997281.xls
BOQ • 0.32 MB
TCsubstation.pdf
Other Document • 5.09 MB
Download all tender documents and submit your bid