| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹53.7 LAdmitted-Finance | -5.11% | ₹53.7 L | L1 | Admitted-Finance |
| 2 | L2₹55.4 L+₹1.8 L (3.28%)Admitted-Finance | -2.00% | ₹55.4 L+₹1.8 L (3.28%) | L2 | Admitted-Finance |
Tender Value
₹56.6 L
EMD Value
₹1.1 L
Closing Date
24 May 2026, 6:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, PWD, ELECTRICAL CIRCLE-II
Annual Operation and Maintenance Of 33/11 KV SubStation At Rajasthan Secretariat, Jaipur
2026_CEPWD_560235_3
EESectt_nit_03_26-27
Open Tender
Electrical Works
Percentage
300 days
Electric work/EESECTT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EESECTT/MDRISL
₹1.1 L
Yes
SUPERINTENDING ENGINEER, PWD, ELECTRICAL CIRCLE-II
30 May 2026
19 May 2026
25 May 2026
19 May 2026
24 May 2026
19 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1All in all comprehensive maintenance of 11/0.415 KV or 33/0.415 KV Distribution sub station including 11 KV circuit Breaker , Transformer and its complete accessories , Auto transfer switch ,repairing of LT/HT cables with terminations, LT panel with complete accessories , Sub station Earthings etc with maintaining of Log Books complete in all respect but excluding of transformer oil as and when required. | |||||
| 1.1 | Substation Up to 500 KVA rating Transformer | - | Job per KVA per Month | - | - |
| 2Substation Above 500 KVA Transformer | |||||
| 2.1 | Substation with 33/11 KV Transformer | - | Job per KVA per Month | - | - |
| 2.2 | All in all comprehensive maintenance including servicing , replacement of fuel - filter, coolant , lubricating oil etc of Diesel Generating set including auto mains failure (AMF) panel , change over switch , earthing etc as per OEM guidelines and maintenance manual complete in all respet. (Excluding replacement of batteries as and when required.) | - | - | - | - |
| 2.3 | Above 62.5 KVA | - | Job per KVA per Month | - | - |
| 2.4 | All in all comprehensive maintenance of Automatic power factor correction panel including repair / replacement of defective componenets to maintain the power factor as per Discom's permissible limit and without any penalty or surcharge. | - | - | - | - |
| 2.5 | Above 125 kvar APFC Panels | - | Job per KVAR per Month | - | - |
| 2.6 | Providing Manpower through Contracting agency for Supervision / Execution / Operation of various Electromechanical Installations. (one shift of 8 working Hrs per day for 26 Working Days in a month) on basis of minimum wages + VDA order Dt. 28.03.2025 Ministry of Labour and Employement Govt. of India | - | - | - | - |
| 2.7 | Engineer with B.Tech and1 Yrs, experience ,/Diploma Engineer with 3 Yrs. Experience in relevant field | - | Each Per Month | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.72 MB
Tendernotice_2.pdf
PDF • 0.14 MB
Tendernotice_3.pdf
PDF • 1.46 MB
Tendernotice_4.pdf
PDF • 0.39 MB
Tendernotice_5.pdf
PDF • 0.61 MB
BOQ_997281.xls
BOQ • 0.32 MB
TCsubstation.pdf
Other Document • 5.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .