Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 LAccepted-AOC | ₹17.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.6 LRejected-Finance | ₹17.6 L | L2 | Rejected-Finance l2 |
Tender Value
Refer Docs
EMD Value
₹35,200
Closing Date
21 Feb 2026, 3:30 pmClosed
EE,AE,DAO
EE,AE,DAO
6- Gram Ibrahimabad Gawdi Mai Sarda Kay Ghar Say Talab Tak CC Road Nirman.
2026_REDUP_1116616_4
1686/red/tndr/25-26dt21-01-26
Open Tender
Civil Works - Roads
90 days
EE RED BAGHPAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹854
₹35,200
Yes
13 Apr 2026
16 Feb 2026
21 Feb 2026
16 Feb 2026
21 Feb 2026
16 Feb 2026
Dismantling of existing Dry brick pitching or brick soling as per IS 2.04/ 202D
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3+3Km Lead
Providing and Laying Base Concrete as per drawings and technical specifications in Proportion of 1:6:12( Cement: Fine Sand: 40mm Gauge Brick Ballast)
Brick masonry work in cement mortar in substructure (Fdn and Plinth) complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 In 1:4 Cement mortar
Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. grade M 20 Nominal mix (1:2:4)
Construction of un-reinforced, with expansion and construction joint , plain cement concrete pavement, thickness as per design, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (1:1.5:3) Coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate including Cost of Polythene Sheet also including complete shifting of matrials & Concrete etc.(M-30) as SI No-new 9(1) of Chapter 20.
S/F Information /sign board i/c all comp. at site.
Deduction of Cost of Brick Ballast
ADD GST 18 %
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_2074103.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.71 MB
Tendernotice_2.pdf
PDF • 8.71 MB
BOQ_2074103.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid