| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance 5 57 CALDWELL COLONY 1ST STREET TUTICORIN 628 008 | TUTICORIN | TAMIL NADU | 628008 | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹7.3 L (4.73%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹1.6 Cr+₹7.3 L (4.73%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹7.6 L (4.93%)Admitted-Finance | ₹1.6 Cr+₹7.6 L (4.93%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 Cr+₹7.9 L (5.09%)Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹1.6 Cr+₹7.9 L (5.09%) | L4 | Admitted-Finance |
| 5 | L5₹1.7 Cr+₹16.1 L (10.4%)Admitted-Finance PLOT NO 5 SATHYAM GARDEN UYIRIYAL POONGA ROAD GORIMEDU SALEM 636 008 | SALEM | SALEM | TAMIL NADU | 636008 | ₹1.7 Cr+₹16.1 L (10.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KUMAAR ENTERPRISES L1 | K DHINAKARAN L2 | A.H.CONSTRUCTIONS L3 | M s Kumaresan and co L4 | RAJ ENGINEERING CONTRACTOR L5 | ULTRAPOWER BUILDERS L6 | C.GOVINDAN L7 | MSS CONTRACTORS L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for Hard Gravelly soil SS | 1,071 | cum | - | - | - | - | - | - | - | - |
| 2.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for SDR NOT REQUIRING BLASTING | 153 | cum | - | - | - | - | - | - | - | - |
| 3.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for MR & DMR NOT Requiring BLASTING | 153 | cum | - | - | - | - | - | - | - | - |
| 4.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for Hard rock require blasting | 76.5 | cum | - | - | - | - | - | - | - | - |
| 5.00 | Earth work excavation for hard rock requiring wedging and chisseling and removing from site including cost of all labour, lead, lift, etc. complete and as directed by the Dept. Engineer at site. | 76.5 | cum | - | - | - | - | - | - | - | - |
| 6.00 | Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour,materials ,lead, lift, curing etc.complete | 45 | m3 | - | - | - | - | - | - | - | - |
| 7.00 | RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement. (By using mixer machine and vibrators) and as directed by the Engineer-in-charge at site. | 360 | m3 | - | - | - | - | - | - | - | - |
| 8.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour, cost of binding wire etc.comlete and as directed by the Engineer-in-charge at site. | 23.5 | MT | - | - | - | - | - | - | - | - |
| 9.00 | Supply and fabrication charges of template set to suit T4 and C4 columns foundation bolts fixing etc including cost of all labour lead and lift etc complete . | 750 | kg | - | - | - | - | - | - | - | - |
| 10.00 | Labour charges for assembling of template set for T4 and C4 columns foundation as per standard drawing and aligning and fixing in position bolts fixing, etc including cost of all labour lead and lift etc complete | 32 | Nos | - | - | - | - | - | - | - | - |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
3 Sept 2020, 2:00 pmClosed
CE/TP-I/CHN
A10,Guindy Ind Estate,Guindy ,Chennai
Providing foundation concrete, supply and erection of 230 KV T4 type towers, 110 KV C4 type towers and Booms for the proposed Hosur 230/110 KV SS
2020_EB_176130_1
TP1-026/2020-21
Open Tender
Civil Works
Works
120 days
Guindy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.5 L
Yes
7 Oct 2020
19 Aug 2020
4 Sept 2020
19 Aug 2020
3 Sept 2020
19 Aug 2020
Amount
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for Hard Gravelly soil SS
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for SDR NOT REQUIRING BLASTING
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for MR & DMR NOT Requiring BLASTING
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for Hard rock require blasting
Earth work excavation for hard rock requiring wedging and chisseling and removing from site including cost of all labour, lead, lift, etc. complete and as directed by the Dept. Engineer at site.
Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour,materials ,lead, lift, curing etc.complete
RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement. (By using mixer machine and vibrators) and as directed by the Engineer-in-charge at site.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour, cost of binding wire etc.comlete and as directed by the Engineer-in-charge at site.
Supply and fabrication charges of template set to suit T4 and C4 columns foundation bolts fixing etc including cost of all labour lead and lift etc complete .
Labour charges for assembling of template set for T4 and C4 columns foundation as per standard drawing and aligning and fixing in position bolts fixing, etc including cost of all labour lead and lift etc complete
Labour charges for transporting and erection of Tower parts including sorting out of Tower and all tools and plants including cost of all materials all lead lift etc complete
Plastering with CM 1:3, mix 12mm thick for inside and outside walls including all cost labour materials lead lift etc complete and as directed by the Engineer-in-charge at site.
Painting with two coats of best quality interior/ exterior emulsion of approved colour over a interior primer coat, including cost of all labour, lead, lift, etc., complete and as directed by the department Engineer at site.
Supply of 230kv & 110kv structure tower parts and coloumns parts (AH, T4 &C4) at site as pre the drawing with DODL.including cost of freght charges for transporting, lifts, shorting out etc., complete.
Supplying and transport of various size of ISI GI Bolt&Nut and washer as per IS standards and approved by competent authority before erection as per the requirement to site including cost of material lead lift labour etc complete. GI steel
Labour charges for fixing of grouting bolt including aligining in position,labour,lead,lift etc., complete
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
K DHINAKARAN
A.H.CONSTRUCTIONS
M s Kumaresan and co
RAJ ENGINEERING CONTRACTOR
ULTRAPOWER BUILDERS
C.GOVINDAN
MSS CONTRACTORS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_210973.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .