Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-AOC | ₹16.5 L Quoted ₹18.7 L | L1 | Accepted-AOC Less ER |
| 2 | L2₹19.5 LRejected-AOC NO 101 A KILMUDALAMBEDU POST PERUVOYAL VILL GUMMIDIPOONDI TALUK TIRUVALLUR 601206 | GUMMIDIPOONDI | TIRUVALLUR | TAMIL NADU | 601206 | ₹19.5 L | L2 | Rejected-AOC Above ER |
| Sl No | Description | Qty | Unit | M/s. SARASWATHI ENTERPRISES L2 | M/S. SAI SABARI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Construction of anganwadi building at Enathimelpakkam Colony in Enathimelpakkam panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. | 48.95 | Cum | 350 ₹17,133 | 254 ₹12,433 Lowest |
| 3.00 | Filling with M.Sand including cost and coveyance of all materials to work site and all labour charges etc., complete as per standard specification. | 9.86 | Cum | 2,750 ₹27,115 | 2,154 ₹21,238 Lowest |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc., complete as per standard specification. | 12.38 | Cum | 5,514 ₹68,263 Lowest | 5,514 ₹68,263 Lowest |
| 5.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc., complete as per standard specification. | 5.63 | Cum | 5,745 ₹32,344 Lowest | 5,745 ₹32,344 Lowest |
| 6.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc., complete as per standard specification. | 27.44 | Cum | 5,964 ₹1,63,652 Lowest | 5,964 ₹1,63,652 Lowest |
| 7.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc., complete as per standard specification. | 16.15 | Cum | 8,124 ₹1,31,203 Lowest | 8,124 ₹1,31,203 Lowest |
| 8.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc., complete as per standard specification. | 12.78 | Cum | 8,421 ₹1,07,620 Lowest | 8,421 ₹1,07,620 Lowest |
| 9.00 | Supplying and erecting for sides & soffits including supports and strutting for plane surface in all floors including cost and conveyance and all labour charges etc., complete as per standard specification.up to basemnet | 41.79 | Sqm | 756 ₹31,593 Lowest | 756 ₹31,593 Lowest |
| 10.00 | Supplying and erecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc., complete as per standard specification.above Basement | 125.26 | Sqm | 1,500 ₹1,87,890 | 1,055 ₹1,32,149 Lowest |
Tender Value
₹17.3 L
EMD Value
₹35,000
Closing Date
28 Apr 2025, 3:00 pmClosed
Block Development Officer
Block Development Office , Kottaikarai , Gummidipoondi
Construction of anganwadi Building at Enathimelpakkam colony in Enathimelpakkam panchayat Gummidipoondi Union Under AGAMT II 2025-26
2025_RDTN_551820_1
RC NO 2629/2025/A7
Open Tender
Civil Works
Item Rate
Gummidipoondi
Please Refer Tender Document
5 documents required · 5 mandatory
₹0
₹35,000
Yes
Gummidipoondi
22 Jul 2026
26 Apr 2025
28 Apr 2025
26 Apr 2025
28 Apr 2025
26 Apr 2025
26 Apr 2025
Amount
Construction of anganwadi building at Enathimelpakkam Colony in Enathimelpakkam panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification.
Filling with M.Sand including cost and coveyance of all materials to work site and all labour charges etc., complete as per standard specification.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc., complete as per standard specification.
Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc., complete as per standard specification.
Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc., complete as per standard specification.
RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc., complete as per standard specification.
RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc., complete as per standard specification.
Supplying and erecting for sides & soffits including supports and strutting for plane surface in all floors including cost and conveyance and all labour charges etc., complete as per standard specification.up to basemnet
Supplying and erecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc., complete as per standard specification.above Basement
Supply and fabrication of steel including cost and conveyance and alla labour charges etc., complete as per standard specification.
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc., complete as per standard specification.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with cement mortar 1:3, 10mm thick including cost and conveyance and all labour charges etc., complete as per standard specification.
Granolithic floor finish with C.M. 1: 2:4 mix to 25mm thick using 10 to 12 mm chips including cost and conveyance and all labour charges etc,. complete as per standard specification.
Paving the Floor with shahabad stone size 600x600x20mm laid in CM 1;3,10mm thick and pointing with white cement 0.40kg per sqm mixed with colouring pigment to suit the colour of the tiles including cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification.
Paving the Floor with Antiskid tiles of size 305x305x6mm laid in CM 1;2,10mm thick and pointing with white cement 0.40kg per sqm mixed with colouring pigment to suit the colour of the tiles including cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification.
Supply and fixing doors and windows including all charges etc., complete as per standard specification.
Door D
Door D1
Door D2
Window W1
Window W
upvc ACRYLIC SHUTTERWindow W1
ventilator
ventilator
Provision for electrification arrangements with service connection etc., complete as per standard specification.t
Light point SD 25
Fan point SD 25
Fan SOR SD 107
Plug point SD 38
CFL lamp-BH fitting SD 80
DPIC swtich of 500 V SD 154
G I Pipe (40mm)
Service Wire SD 64
Exhaust fan SD 114
Bulk head fitting SD 83
E B Deposit
Painting two coat with approved quality of oil bound distemper with colour over one coat of white cement for primier coat for the base including preparing surface and all materials cost labour etc., complete as per standard specification.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification.
Painting two coats using Ist quality readymix enamel paint of approved colour over new iron work including cost and conveyance and all labour charges etc., complete as per standard specification.
Towards the cost and supply of 4" Rainwater Downfall pipe fixing with clamps etc., complete as per standard specification.
Provision for European water closet including labour charges
Provision for 500 liters watertank
Provision for RWH arrangements 4Nos 1.5m DIA RCC RINGS WITH 40mm,20mm,SAND FILLING
Provision of BaLA painting , cartoons in hall and toilet & Letters, Pictures & Board, etc.
Provision for baby friendly basin
Supplying and fixing in position best quality and approved make Indian made white earthernware wash hand basin of size 550 x 400mm without pedestal with a pair of cast iron brackets, including cost 15mm dia brass CP pillar tap, 32mm dia "B" class GI waste pipe with rubber plug and chain, 15mm dia GM wheel valve, 15mm brass nipple, 15mm dia nylone connection, 32mm dia CP brass waste coupling including fixing of wash basin using CI brackets on to the wall in position with TW plugs and screws, rubber washers, white lead and giving necessary water supply connection and painting the brackets with two coat of painting over a priming coat of anti-corrosive paint including testing for leakages etc., complete complying with standard specification and as directed by the departmental officers. (The wash hand basin and specials should be got approved by the Executive Engineer before use on works).
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/s. SARASWATHI ENTERPRISES (BID ID -1323422)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].