| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC BHUNANEHRA HARYANA | ₹2.6 L | L1 | Accepted-AOC ok |
| 2 | L2₹3.0 L+₹36,428.34 (14.0%)Rejected-Finance | ₹3.0 L+₹36,428.34 (14.0%) | L2 | Rejected-Finance Higher Bid |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Others-No resolution has been attached |
Tender Value
₹3.3 L
EMD Value
₹6,600
Closing Date
27 May 2026, 5:00 pmClosed
BHUPENDER SINGH
DIV 2 Hissar
Annual Maintenance estimate for roads in residential area No. III, MT Kalanwali for the Year 20205-2026.
2026_HBC_523250_1
2026BF2AD388 4C2A 4096 97EA 71FFBF6491DC260HSV
Open Tender
Civil Works
Works
90 days
Kalanwali
97/2026
2 documents required · 2 mandatory
₹250
Yes
₹6,600
Yes
7 Aug 2026
21 May 2026
28 May 2026
21 May 2026
27 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [1.PM026] PM026. Tractor with trolley | 5 | Per day | 6,237 | ₹31,185 |
| 2 | [11.58]Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete | 72.8 | Sqm | 32 | ₹2,329.6 |
| 3 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. | 72.8 | Sqm | 31 | ₹2,256.8 |
| 4 | [14.51.1]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 1. Hire Charges forJCB with bucket capacity of 0.4 cum | 5 | Per day | 6,493 | ₹32,465 |
| 5 | [18.59]Supply of wooden pegs for alignment work, 40 cm long 75mm dia | 2 | 100 Nos. | 603 | ₹1,206 |
| 6 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 1.82 | cum | 3,975 | ₹7,234.5 |
| 7 | [6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns | 72.8 | Sqm | 155 | ₹11,284 |
| 8 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | 145.6 | Kg. | 66 | ₹9,609.6 |
| 9 | DEMARCATION OF VARIOUS SECTORS AT KALANWALI INCLUDING DGPS MACHINE CHARGE , OPERATOR AND LABORS ETC.( EXCLUDING GST) | 10,11,715 | Sqm | 0.23 | ₹2,32,694.45 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_602182.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .