| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance | L1 | Accepted-Finance OK | |
| 2 | L2₹1.6 L+₹1,353 (0.85%)Accepted-Finance | L2 | Accepted-Finance OK | |
| 3 | Rejected-Technical | - | Rejected-Technical ALL REQUIRED DOCUMENT NOT COMPLETED |
Tender Value
₹1.6 L
EMD Value
₹2,000
Closing Date
22 Feb 2025, 12:00 pmClosed
SE EDC BIJNOR
AVAS VIKAS COLONY, BIJNOR
The work of shifting LT/HT Line passing near/above 11 No. primary/upar primary schools Under EDD, Bijnor, Kiratpur, Chandpur and Noorpur in Naveen Jila Vidyut Vikas Nidhi under EDC, Bijnor.
2025_PVVNL_999379_1
14/2024-25/EDC BIJNOR
Open Tender
Electrical Works
Item Rate
90 days
SE EDC BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC BIJNOR
₹2,000
1 Mar 2025
28 Jan 2025
22 Feb 2025
28 Jan 2025
22 Feb 2025
28 Jan 2025
Amount
Safe carriage of following material from Store Centre to site /JE store with loading & unloading at both ends respectively.
PCC Pole 8.5 Mtr Long
ACSR Weasel Conductor
LT ABC (3X95+1X70+1X16)
LT ABC (3X50+1X35+1X16)
Stay Set Complet
T-Off Channel 100x50x1250 Sqmm
11 KV Disc Insulator With Fitting
11 KV Pin Insulator with Pin
11 KV Steel X-Arm V Type
Stay Wire 7/10 SWG
Earthing Rod
GI Wire
Distribution Box
Top Channel
Dropper Channel
Sub-Station Angle
Instaletion of Following Material With All Accessories (as per respo norms)
Erection of PCC Pole
Erection of Double Pole with 100 KVA T/F
Grouting of PCC/ST pole (as per respo norms).
Digging of stay.(as per respo norms).
Grouting of Earthing for PCC Pole (as per respo norms).
Grouting of Stay Set (as per respo norms).
Fixing of T-Off Channel 100x50x1250 Sqmm (as per respo norms).
Fixing of 11 KV Disc Insulator With Fitting (as per respo norms).
Fixing of 11 KV Pin Insulator with Pin (as per respo norms).
Fixing of 11 KV Steel X-Arm V Type (as per respo norms).
Fixing of Dropper Channel (as per respo norms).
Fixing of Sub-Station Angle (as per respo norms).
Installing of Top Channel (as per respo norms).
Laying straighting sagging and binding of ACSR weasel/Dog/Rabit conductor on line. (as per respo norms).
Laying straighting sagging and binding of ABC Cable on line. (as per respo norms)
Dismentaling, Shifting and Mounting of 100 KVA T/F on Double Pole as per respo norms
Dismentaling, Shifting and Mounting of 10 KVA T/F on Singal Pole as per respo norms
Providing and Installing/Fixing of Following Material by Contractor with all Accessories (as per respo norms),
Nut & Bolts
LT Distribution Box Clamp
F-Bracket with Bolt & Nut
LT Clamp for PCC Pole
LT Shackle Insulator
Clamp with Bolt & Nut
Stay Clamp
Stay Insulator
Suspension Clamp
PG Clamp
Locs Per Distribution Box
Dead end Clamp with 1 Hook Installed
Holding Clamps With Nut and Bolts.
Holding Clamps for Cross Arm/Tee Channel/Gaurding Clamp
Stone Pad
Danger Board
Number Plate
Dismenteling and received back of scrap Material to ESC Bijnor with loading & unloading at both ends (as per respo norms)
ACSR Weasel Conductor
T-Off Channel
Top Channel
Dropper Channel
Sub-Station Angle
DEEPAK KUMAR (BID ID -4981980)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .