Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹8.4 Laccepted-aoc | accepted-aoc |
Tender Value
₹8.5 L
EMD Value
₹21,500
Closing Date
23 Apr 2026, 9:30 pmClosed
Rural Development and Panchayat Raj Department
SHAMSUNDAR KALEKAR
Construction of Mailarlingeshwar Devasthan Samudaya Bhavan at Hannikera village in Chittapur Taluka under MLA LAD for the year 2025-26.
RDPR/2026-27/BD/WORK_INDENT26001
RDPR/2026-27/BD/WORK_INDENT26001
Open
Buildings
Electronic Documents, First(One Cover)
RDPR Division Office Kalaburgi
4 documents required · 4 mandatory
₹500
₹21,500
23 Apr 2026
9 Apr 2026
23 Apr 2026
Construction of Mailarlingeshwar Devasthan Samudaya Bhavan at Hannikera village in Chittapur Taluka under MLA LAD for the year 2025-26.
Providing and laying in position Reinforcement Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. T...
Providing and laying in position Reinforcement Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. T...
Providing and laying in position Reinforcement Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. T...
Providing and laying in position Reinforcement Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. T...
Centering and shuttering charges for Coloumn with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per sp...
For Centering and Shuttering Charges 50% slabwith all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per sp...
For Centering and Shuttering Charges 60% beams with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per ...
For Centering and Shuttering Charges 50% slabwith all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments incidental Charges etc., complete and as per sp...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking,...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Bid Document 38 Works 23 April 2026.zip
Tender Document • 5.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .