Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Technical | Admitted-Technical All the documents required as per NIT have been uploaded by the Bidder successfully |
| 2 | Admitted-Technical | Admitted-Technical All the documents required as per NIT have been uploaded by the Bidder successfully |
| 3 | Admitted-Technical | Admitted-Technical All the documents required as per NIT have been uploaded by the Bidder successfully |
| 4 | Admitted-Technical | Admitted-Technical All the documents required as per NIT have been uploaded by the Bidder successfully |
| 5 | Admitted-Technical | Admitted-Technical All the documents required as per NIT have been uploaded by the Bidder successfully |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
17 Apr 2026, 4:00 pmClosed
Executive Engineer RandB Division Bandipora
Office of the Xen RandB Division Bandipora
Repair and Routine maintenance of roads under Performance based maintenance stage contract 2026-27 of RandB Sub Division Bandipora Block Bandipora and Arin
2026_PWDJK_307636_1
e NIT No.09 of 2026-27 Dated 09-04-2026
Open Tender
Civil Works
Percentage
Bandipora
As per NIT
2 documents required · 2 mandatory
₹200
Executive Engineer R and B Division Bandipora
₹10,000
Bandipora near DC Office
13 May 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and filling of granular sub base material/Nallah Muck including spreading in layers not exceeding 150mm thick in layer, leveling, watering and consolidation with power road roller 8 to 10 ton to the required gradient and camber including all carriages as involved up to site of work complete | - | Cum | - | - |
| 2 | Supply and filling of Khak bajri to sepcified lines grades and cross sections carried by lorry incl. levelling, dressing and compaction by PRR of 8-10 ton capacity incl. all carriages complete job, (side berms and ditch filling) | - | Cum | - | - |
| 3 | Supply, stacking, laying, spreading and compacting graded crushed stone aggregate of size 63mm-45mm to water bound macadam specifications in uniform thickness, hand picking, rolled with three wheeled road roller / vibratory roller 8-10ton capacity kin stages to proper grade and camber, applying and brooming type ''A" of screening and binding material to fill up interstices oif coarse aggregate, watering and compacting to the required density finished work to be measured (75mm compoacted thickness) including all carriages of materials up to site of work complete | - | Cum | - | - |
| 4 | Providing and laying of 25mm thick dense bituminous concrete with bitumen V-G-10 Grade @5.5% and filler (lime) @3% by weight of total mix on prepared surface with specified graded stone aggregate , hot mixing of bitumen with filler and stone aggregate in hot mix plant, transporting the mixed material by tripper to paver and laying the mixed material by paver finisher and rolling with Road Roller as per IRC/MOST/MORTH Specifications to achieve the desired density and compaction incld. Cost and carriage of all materials involved from source upto site of work complete including cost and carriage of bitumen. | - | Sqm | - | - |
| 5 | Providing and laying of 25-40 mm thick premix Road Repair Compound (Readymade) that is a mixture of unheated mineral aggregate and emulsified bitumen. The aggregates passing through the sieve size 10 mm = 95-100% , 4.75 mm = 60-70 %, 2.36 mm = 12-15 %, 0.075 mm = 2-3 %. The volatile matter content 0.95% , bitumen content 6 %, the compound shall attain 35% strength within 30 mins and 70 % strength within 24 hours. The compound shall have a minimum bonding strength of 2.5 kg/sqcm, including cleaning and preparing the existing road surface to remove all dirt, dust, mud etc and finally booming the surface as per required specification on (including cost & carriage of all materials) including rolling with PRR of 8-10 tonne capacity incl. a coat of tack coat or a coat of bituminous emulsion all complete. | - | Sqm | - | - |
| 6 | Supplying, laying, stacking and splashing at site crushed stone dust/Moorum including all carriages | - | Cum | - | - |
| 7 | Clearance of drains/construction of kaccha drain (manual /mechnanical means) by way of removing accumulated / deposited mulba, silt, rubbish vegetation, etc, including disposal of the same beyond municipal limits or as directed by the EIC including loading and unloading etc complete. | - | Cum | - | - |
| 8 | Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade on old steel work (One or more coats) including cleaning of the surface complete. | - | Sqm | - | - |
| 9 | Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girthupto30cm measured at height of 1m above ground level (levelling of berms) and disposal of rubbish and other materials outside the municipal limits or as directed by EIC complete. | - | Sqm | - | - |
| 10 | Removal of fallen trees from roads upto girth of
i. 3' girth | - | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
finance_997919.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.99 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_997919.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .