Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 CrAccepted-AOC 4 9 359 P 14 BESIDE SAI BABA TEMPLE RTC COLONY HAYATH NAGAR HYDERABAD 501 505 | HYDERABAD | HAYATH NAGAR | TELANGANA | 501505 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹12.7 Cr+₹1.1 Cr (9.42%)Rejected-Finance 116 RUNWAL DIAMOND OPP PALACE ORCHARD N I B M UNDRI ROAD MOHAMADWADI PUNE 411 060 | PUNE | PUNE | MAHARASHTRA | 411060 | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹12.8 Cr+₹1.2 Cr (10.3%)Rejected-Finance 19 CHANAN SINGH PARK KIRBY PLACE DELHI CANTT | DELHI | NEW DELHI | DELHI | 110010 | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹13.0 Cr+₹1.3 Cr (11.2%)Rejected-Finance 20 SC BOSE COLONY GALI NO 02 DEFENCE LAB ROAD RATNADA JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | L4 | Rejected-Finance Other than lowest bidder | |
| 5 | L5₹13.4 Cr+₹1.7 Cr (14.9%)Rejected-Finance 1630 SECTOR 7 C CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160019 | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | United Sales Corporation L2 | M K ENGINEERS CO. L4 | SHRI GANESH ENTERPRISES L1 | NSC Projects Pvt. Ltd. L7 | B D RAIZADA PROJCTS PVT LTD L3 | ms singh construction L6 | SAGGI ELECTRIC COMPANY L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE "A" Part - I (BUILDINGS/STRUCTURES WORK) Details of Buildings are given here-in-before:- | ||||||||||
| 2.00 | Construction of 01 block of Sub station building in including toilet in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | 1 | Each | 1,50,00,000 ₹1,50,00,000 | 78,53,000 ₹78,53,000 | 1,10,00,000 ₹1,10,00,000 | 1,08,88,627 ₹1,08,88,627 | 74,90,000 ₹74,90,000 Lowest | 1,05,00,000 ₹1,05,00,000 | 1,70,40,777 ₹1,70,40,777 |
| 3.00 | Construction of 01 block of Car Parking(For 03 Cars) in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | 1 | Each | 25,00,000 ₹25,00,000 | 8,55,000 ₹8,55,000 | 11,00,000 ₹11,00,000 | 13,58,640 ₹13,58,640 | 6,69,000 ₹6,69,000 Lowest | 11,47,500 ₹11,47,500 | 11,89,606 ₹11,89,606 |
| 4.00 | Construction of 01 block of Scooter Parking(For 17 Scooters) in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | 1 | Each | 30,00,000 ₹30,00,000 | 7,56,000 ₹7,56,000 | 10,00,000 ₹10,00,000 | 12,75,300 ₹12,75,300 | 6,09,000 ₹6,09,000 Lowest | 10,20,600 ₹10,20,600 | 12,17,207 ₹12,17,207 |
| 5.00 | SCHEDULE "A" PART- II
( SITE CLEARENCE AND AREA DEVELOPMENT)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 21,61,991.2 ₹21,61,991.2 | 15,00,000 ₹15,00,000 | 21,61,991.2 ₹21,61,991.2 | 12,98,000 ₹12,98,000 Lowest | 18,29,900 ₹18,29,900 | 19,45,791 ₹19,45,791 | 16,82,070 ₹16,82,070 |
| 6.00 | SCHEDULE "A" PART- III
(INTERNAL ELECTRIFICATION)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 2,40,068.15 ₹2,40,068.15 | 2,50,000 ₹2,50,000 | 2,40,068.15 ₹2,40,068.15 | 2,47,340 ₹2,47,340 | 2,40,069 ₹2,40,069 | 2,16,061 ₹2,16,061 | 2,14,110 ₹2,14,110 Lowest |
| 7.00 | SCHEDULE "A" PART- IV
(INTERNAL WATER SUPPLY)
Details of prepriced Schedule is given in tender documents. | 1 | Lump sum | 15,000 ₹15,000 | 15,000 ₹15,000 | 12,686.34 ₹12,686.34 | 22,000 ₹22,000 | 19,000 ₹19,000 | 18,394 ₹18,394 | 11,856 ₹11,856 Lowest |
| 8.00 | SCHEDULE "A" PART-V
(ROAD/PATH/CULVERT )
Details of prepriced Schedule is given in tender documents. | 1 | Lump sum | 1,75,00,000 ₹1,75,00,000 | 1,50,00,000 ₹1,50,00,000 | 1,50,00,000 ₹1,50,00,000 | 1,79,64,008 ₹1,79,64,008 | 1,88,90,000 ₹1,88,90,000 | 1,75,00,000 ₹1,75,00,000 | 1,40,79,000 ₹1,40,79,000 Lowest |
| 9.00 | SCHEDULE "A" PART- VI
(AREA DRAINAGE)
Details of prepriced Schedule is given in tender documents. | 1 | Lump sum | 5,75,000 ₹5,75,000 | 6,00,000 ₹6,00,000 | 5,23,819.56 ₹5,23,819.56 | 5,82,105 ₹5,82,105 | 7,69,000 ₹7,69,000 | 8,64,301 ₹8,64,301 | 4,71,869 ₹4,71,869 Lowest |
| 10.00 | SCHEDULE "A" PART- VII
(SEWAGE DISPOSAL)
Details of prepriced Schedule is given in tender documents. | 1 | Lump sum | 2,25,000 ₹2,25,000 | 2,00,000 ₹2,00,000 | 1,51,848.93 ₹1,51,848.93 | 3,07,523 ₹3,07,523 | 2,09,000 ₹2,09,000 | 2,96,103 ₹2,96,103 | 1,33,380 ₹1,33,380 Lowest |
Tender Value
₹15.6 Cr
EMD Value
₹11.1 L
Closing Date
15 Sept 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER AF SHILLONG ZONE
HQ CHIEF ENGINEER AF SHILLONG ZONE MILITARY ENGINEER SERVICES ELEPHANT FALLS CAMP PO NONGLYER SHILLONG 793009
WORK SERVICES FOR INFRASTRUCTURE DEVELOPMENT FOR INDUCTION OF TECHNICAL EQUIPMENT AT AF STN DINJAN
2025_MES_723780_1
88684/DIN/E8
Open Tender
Civil Works
Lump-sum
545 days
Mohanbari
As per tender documents
8 documents required · 8 mandatory
₹3,000
GE AF Mohanbari
₹11.1 L
Yes
31 Oct 2025
31 Jul 2025
17 Sept 2025
31 Jul 2025
15 Sept 2025
8 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_810139.xls
BOQ • 0.45 MB
177170695.pdf
Tender Documents • 0.58 MB
177170696.pdf
Tender Documents • 0.47 MB
177170698.html
Tender Documents • 0.06 MB
179412818.pdf
Tender Documents • 0.25 MB
180122976.pdf
Tender Documents • 0.26 MB
Drawings.rar
Tender Documents • 37.48 MB
Tender.pdf
Tender Documents • 2.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .