SE EDC-I RAEBARELI
SE EDC-I RAEBARELI
WORK MENTIONED IN BOQ
2021_MVVNL_593347_1
25/EDC-I,R/2021-22
Open Tender
Electrical Works
Item Wise
30 days
UNDER EDD-I RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EX ENGINEER C AND MC RAEBARELI
₹2,000
Yes
21 Jun 2021
11 Jun 2021
18 Jun 2021
11 Jun 2021
17 Jun 2021
11 Jun 2021
Amount
CARTAGE OF STORE ITEMS FORM ESC, RAEBARELI TO DUMP SITE AND DUMP SITE TO WORK SITE ALONG WITH LOADING, UN-LOADING AND PROPER STACKING
11 KV PILFER RESISTANCE METERING CUIBICAL WITH CABLE TERMINATION KIT Ctr. 50/5A
11 Mtr long ST Poles
9 Mtr long ST Poles
8.5 Mtr long PCC Poles
loose line material including ACSR weasel conductor Mtr. 90.00, ACSR Rabbit conductor Mtr. 20.00, ABC of size 3x50MM2 Mtr. 50.00, 11KV XLPE CABLE of size 3x70Mtr. 80.00 and other remaning items.
Cortage of following 25KVA T/F
Cortage of following 63KVA T/F
Errection
Dis-mounting of existing 25KVA T/F
Errection of 11Mtr ST Pole including digging of Pits & fitting of accessories.
Errection of 9 Mtr ST Pole including digging of Pits & fitting of accessories.
Errection of D/P by 8.5 Mtr PCC Pole including digging of Pits & fitting of accessories.
Errection of D/P by 9 Mtr. Long ST Pole including digging of Pits & fitting of accessories.
Earthing of poles as per RESSPO norms.
Digging of pits, fixing nozzling & grouting of stay rods as per RESSPO norms including grouting materials.
Grouting of Poles as per RESSPO norms with grouting materials.
Laying, stringing & sagging of 3Ø3wire 11 kv LT line by ACSR weasel conductor including all associated works & making clearance of road with joints/jumpers & binding on insulators as required.
Laying of ABC of size 3x50mm2.complete in all respect as per RESSPO norms
Laying of XLPE cable of size 3x70mm2.complete in all respect as per RESSPO norms
Mounting of 11KV Cable jointing kit (I/D and O/D) suitable for 3x70mm2 XLPE cable. complete in all respect as per RESSPO norms
Mounting/Installation of New 11 Pilfer Proof Metering Quibical Ratio Ctr 50/5A . Complete in all respect as per RESSPO norms.
Mounting of 25 KVA transformer on D/P including all associated works as required.
Mounting of 63 KVA transformer on D/P including all associated works as required.
Cortage of receive back 25KVA T/F from work site to ESC Tripula Raebareli with loading and un-loading.
Stringing and sagging of 2 wire of 6SWG G.I. Wire for guarding and making lacing at 1 meter a part in all the spans .
Shree Geetanjali Agency
M/S SUBHASH TRADERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .