Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.4 LAccepted-AOC N A | L1 | Accepted-AOC Workorder | |
| 2 | L2₹46.9 L+₹2.4 L (5.48%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹45.7 L
EMD Value
₹91,441
Closing Date
16 Nov 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Executive Engineer, BRC, PWD., Puducherry
Office of the Executive Engineer, BRC, PWD., Puducherry
Improvement to Varathan street Kalyanasundaram street Rathinam street Manimegalai street Tagore street and concrete road in VOC street of Anandha Nagar in Kadirkamam Constituency Puducherry
2023_PWDC1_14225_1
57/PW/BRC/23-24
Open Tender
Civil Works - Roads
Item Rate
90 days
Puducherry
Please refer tender documents
3 documents required · 3 mandatory
₹525
₹91,441
19 Dec 2023
9 Nov 2023
17 Nov 2023
9 Nov 2023
16 Nov 2023
9 Nov 2023
Amount
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg. per sqm. on the prepared bituminous / granular surface cleaned with mechanical broom. (As per MoRTH specification, 4th Revision)
Providing and laying bituminous macadam with hot mix plant of capacity not less than 40 -60 TPH using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 507.7 of MoRTH specification, 4th Revision, to achieve the desired compaction. - using grade II metal and bitumen 60/70 grade.
Providing and laying bituminous concrete with HMP of capacity not less than 40 to 60 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 509 of MoRTH specification, 4th Revision, complete in all respects - Using grade-II material.-Bitumen 60/70
"Providing and laying lean reinforced cement concrete pavement over existing concrete base / prepared base with M30 grade concrete with minimum cement content of 405 kg/cum and maximum size of coarse aggregate not exceeding 20mm mixed with super plasticizer at 200ml per bag of cement to improve workability without impairing strength and durability mixed in weight batching plant as per approved mix design, transporting to site, laying, compacting with vibrators and including finishing the top surface smooth with power trowel with floor hardener spinkled @ 4kg/sqm, roughening the surface with steel wire brush in straight direction perpendicular to road. The rate is inclusive of cutting, longitudinal joint of size 4mmx15mm at centre of the road and traverse joints betwen 2 to 3 metre centre to centre. (The rate is exclusive cost of reinforcement, centering and bituminous pad at expansion joints). Note : Cement content considered in this item is @ 405kg/cum. Excess/less cement used as per design mix is payable / recoverable separately - upto plinth level.
Steel reinforcement for R.C.C. works including bending, binding and placing in position - Thermo Mechanical Treated Bars (ISI brand approved make) Fe - 415 or more
Centering shuttering including struttings, propping etc. and removal of form work for foundations, footings , bases for columns.
Providing and fixing in position 12 mm thick bitumen impregnated fibre board conforming to IS : 1838 , including cost of primer , sealing compound in expansion joints
Raising of various types of manholes and flushing tank by cutting alround the manhole cover, removing the frame and cover from the manhole by cutting the B.T., W.B.M., surface, raising the manhole to the required height with brick work in cement motar 1:4 (One cement and four sand), refixing the frame in position by laying cement concrete 1:1.5:3 (One cement one and half sand and three 20mm HBG metal) including curing, but excluding the cost of reinforcement, finishing the top, inside and outside plastering with 20mm thick in cement mortar 1:3(one cement three sand), the rate includes all materials, providing barricading,caution board, watch and ward etc.,complete till the completion of work with minimum hindrance to the traffic.- 30cm height.
P. NETHAJI
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .