| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.4 CrAdmitted-Finance | -15.00% | ₹5.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.7 Cr+₹28.4 L (5.28%)Admitted-Finance | -10.51% | ₹5.7 Cr+₹28.4 L (5.28%) | L2 | Admitted-Finance |
| 3 | L3₹5.8 Cr+₹36.7 L (6.81%)Admitted-Finance | -9.21% | ₹5.8 Cr+₹36.7 L (6.81%) | L3 | Admitted-Finance |
| 4 | L4₹6.0 Cr+₹60.2 L (11.2%)Admitted-Finance 12 041 BHASKAR COMPLEX ASHOK NAGAR GAUTAM BUDDHA MARG LUCKNOW 226018 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226018 | -5.50% | ₹6.0 Cr+₹60.2 L (11.2%) | L4 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹33.7 L
Closing Date
19 Jul 2025, 3:00 pmClosed
Chief Engineer
Lucknow Municipal Corporation
Construction work of Community Hall/Barat Ghar in Patel Park under East Legislative Assembly constituency.
2025_DOLBU_1056653_1
54/CE/2025-26
Open Tender
Civil Works
Percentage
Lucknow Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹41,300
Lucknow Municipal Corporation
₹33.7 L
29 Jul 2025
12 Jul 2025
19 Jul 2025
12 Jul 2025
19 Jul 2025
12 Jul 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BILL OF QUANTITY FOR MAIN BUILDING | |||||
| 1.01 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 540.91 | CUM | 205.62 | ₹1,11,221.91 |
| 1.02 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 627.62 | CUM | 553.36 | ₹3,47,299.8 |
| 1.03 | Providing and laying in position ready mixed or site batched design mix cementconcrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to eithe.r re-design the mix or bear the cost of extra cement. Concrete of M10 grade with minimum cement content of 220 kg /cum | 114.43 | CUM | 6,979.36 | ₹7,98,648.16 |
| 1.04 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | 112.84 | CUM | 1,677.66 | ₹1,89,307.15 |
| 1.05 | Construction of drain along with apron. 150X150MM | 123.89 | RM | 951.36 | ₹1,17,863.99 |
| 1.06 | (4) Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 7.5 liters/sqm (6) Treatment of soil under apron along external perimter 5 liters/sqm. (As per manufacturer's standard dilution) | 1,392.69 | SQM | 244.93 | ₹3,41,111.56 |
| 1.07 | Providing & laying in position machine batched and machine. Mixed design mix M-25 grade cement concrete for reinforcement cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying including the cost of centering, shuttering , finishing and but excluding reinforcement , including admixtures in recommended proportion as per IS : 9103 to acclerate, retarder for setting of concrete/ improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note :- Cement content considered in this item @ 330 kg/cum. Excess or less cement used as per design mix is payable or recoverable separately. R.C.C. work in Plinth Beam | 30.14 | CUM | 7,508.31 | ₹2,26,300.46 |
| 1.08 | R.C.C. work in Footing | 195.75 | CUM | 7,508.31 | ₹14,69,751.68 |
| 1.09 | R.C.C. work in Column | 19.64 | CUM | 7,508.31 | ₹1,47,463.21 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.87 MB
Tenderdocument.pdf
Tender Documents • 8.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .