| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Finance 00 YAKUBPUR NEAR PRIMARY SCHOOL YAKUBPUR YAKUBPUR BULANDSHAHR UTTAR PRADESH 203001 | BULANDSHAHR | UTTAR PRADESH | 203001 | ₹10.6 L | L1 | Admitted-Finance |
| 2 | L2₹10.6 LAdmitted-Finance | ₹10.6 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S SHAURYA TRADERS L2 | shiva enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation of earth with the help of suitable T&P and labour, watering and ramming of excavated earth. | 70.68 | M3 | 147 ₹10,389.96 | 145 ₹10,248.6 Lowest |
| 2.00 | 0.2 Meter concrete with 40mm brick/stone ballast coarse sand and cement in ratio of 1:4:8 in foundation under floor. Including the supply of all material /labour and tools etc. required for completion of work satisfactory including the cost of cement. | 15.71 | M3 | 7,398.5 ₹1,16,230.44 | 7,395 ₹1,16,175.45 Lowest |
| 3.00 | First class brick work for construction of retaining wall in 1:4 mix ratio, Cement and sand including the cost of all material, Labour and T&P etc. required for completion of work. | 145.14 | M3 | 5,697 ₹8,26,862.58 | 5,675 ₹8,23,669.5 Lowest |
| 4.00 | 0.1-Meter-thick concrete in plinth with 20mm stone ballast, coarse sand Cement mortar in ratio of 1:2:4 on the top platform of the foundation including all material, labour and T&P etc. required for proper completion of work. | 2.48 | M3 | 8,735 ₹21,662.8 | 8,730 ₹21,650.4 Lowest |
| 5.00 | 12mm thick plaster work on wall (Outer Surface) with cement and sand in ratio 1:4 including cost of all material, labour and T&P required for proper completion of work. | 141.6 | M2 | 129 ₹18,266.4 | 127 ₹17,983.2 Lowest |
| 6.00 | Earth filling under in area revetment of the towers including the cost of earth to be obtained from outside including watering ramming in 200 mm. layers and dressing of earth etc. complete including the cost of earth royalty, taxes, Fright, skilled labour and T&P. | 10.81 | M3 | 140 ₹1,513.4 | 139 ₹1,502.59 Lowest |
| 7.00 | Brick work on edge floor laid including preparation of base to proper slope in required pattern with bricks of class designation 7.5 on a bed of 12mm mud mortar with filling of joints including supply of all material, labour and T&P etc. required for proper completion of work. | 94.25 | M2 | 718 ₹67,671.5 | 715 ₹67,388.75 Lowest |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
15 Jun 2026, 6:00 pmClosed
SE ETC Shahjahanpur
Electy Trans Circle Shahjahanpur
Work
2026_UPTCL_1156476_1
Short Term E. Tender no. 06ETC(S)/2026-27
Open Tender
Electrical Works
Fixed-rate
60 days
Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
A/c No. 0423002100107147 IFSC Code No. PUNB0042300
₹13,000
10 Aug 2026
2 Jun 2026
16 Jun 2026
2 Jun 2026
15 Jun 2026
2 Jun 2026
2 Jun 2026 - 15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of earth with the help of suitable T&P and labour, watering and ramming of excavated earth. | 70.68 | M3 | - | - |
| 2 | 0.2 Meter concrete with 40mm brick/stone ballast coarse sand and cement in ratio of 1:4:8 in foundation under floor. Including the supply of all material /labour and tools etc. required for completion of work satisfactory including the cost of cement. | 15.71 | M3 | - | - |
| 3 | First class brick work for construction of retaining wall in 1:4 mix ratio, Cement and sand including the cost of all material, Labour and T&P etc. required for completion of work. | 145.14 | M3 | - | - |
| 4 | 0.1-Meter-thick concrete in plinth with 20mm stone ballast, coarse sand Cement mortar in ratio of 1:2:4 on the top platform of the foundation including all material, labour and T&P etc. required for proper completion of work. | 2.48 | M3 | - | - |
| 5 | 12mm thick plaster work on wall (Outer Surface) with cement and sand in ratio 1:4 including cost of all material, labour and T&P required for proper completion of work. | 141.6 | M2 | - | - |
| 6 | Earth filling under in area revetment of the towers including the cost of earth to be obtained from outside including watering ramming in 200 mm. layers and dressing of earth etc. complete including the cost of earth royalty, taxes, Fright, skilled labour and T&P. | 10.81 | M3 | - | - |
| 7 | Brick work on edge floor laid including preparation of base to proper slope in required pattern with bricks of class designation 7.5 on a bed of 12mm mud mortar with filling of joints including supply of all material, labour and T&P etc. required for proper completion of work. | 94.25 | M2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_2166935.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].