Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹8.3 Cr
EMD Value
₹16.7 L
Closing Date
21 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Additional Chief Engineer
Additional Chief Engineer Water Resources Zone Udaipur
Restoration of Nahargarh Dam and Canal GP-Tamboliya PS Bhainsrodgarh, Restoration of Kadmali Dam and Development of micro irrigation system in command area GP- Anoppura PS- Begun
2026_WRDAS_600994_1
ACE NIT No 14 Year 2026-27 Work 3
Open Tender
Civil Works
Percentage
730 days
Chittorgarh
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
Executive Engineer Water Resources Dn
₹16.7 L
Yes
Udaipur
28 Sept 2026
28 Sept 2026
22 Oct 2026
28 Sept 2026
21 Oct 2026
28 Sept 2026
7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area, dewatering wherever required complete in all respect
Hard / dense soil | 97 | cum | 79 | ₹7,663 |
| 1.02 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area, dewatering wherever required complete in all respect
Hard soil mixed with Kankar / boulders, Morrum | 2,428 | cum | 99 | ₹2,40,372 |
| 2.01 | Excavation including loading, unloading, disposal and dressing of excavated rock within initial lead of 50 m and lift upto 1.5 m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect.
Soft / Disintegrated rock | 2,998.8 | cum | 134 | ₹4,01,839.2 |
| 2.02 | Excavation including loading, unloading, disposal and dressing of excavated rock within initial lead of 50 m and lift upto 1.5 m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect.
Hard rock not requiring blasting | 2,112.5 | cum | 201 | ₹4,24,612.5 |
| 2.03 | Excavation including loading, unloading, disposal and dressing of excavated rock within initial lead of 50 m and lift upto 1.5 m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect.
Phylite & other hard rock requiring nominal blasting | 2,062.9 | cum | 291 | ₹6,00,303.9 |
| 2.04 | Excavation including loading, unloading, disposal and dressing of excavated rock within initial lead of 50 m and lift upto 1.5 m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect.
Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with all leads & lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure & royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate. | 3,259.2 | cum | 336 | ₹10,95,091.2 |
| 3.01 | Excavation with line drilling, controlled blasting near structures, populated area (situated within 50m) including dewatering, loading, unloading, disposal & dressing within initial lead of 50m and lift upto 1.5m complete in all respect in dry or moist and also including compensation of damages if any , in :
Phylite & other hard rock requiring nominal blasting | 20 | cum | 473 | ₹9,460 |
| 3.02 | Excavation with line drilling, controlled blasting near structures, populated area (situated within 50m) including dewatering, loading, unloading, disposal & dressing within initial lead of 50m and lift upto 1.5m complete in all respect in dry or moist and also including compensation of damages if any , in :
Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with all leads & lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure & royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate. | 20 | cum | 443 | ₹8,860 |
| 4 | Final excavation by line drilling including removing of hard rock by wedging and barring and chiseling near final levels (only upto 0.3 m depth) without resorting to blasting including dewatering, disposal of excavated material within initial lead of 50m and lift of 1.5m complete in all respect | 18.6 | Cum | 749 | ₹13,931.4 |
| 5 | Preparation of foundation of structure including removal of all loose stones,silt and final washing by manual labour. | 595 | Sqm | 23 | ₹13,685 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.34 MB
DrawingKADMALI.pdf
Additional Documents • 1.57 MB
BOQ_1065252.xls
BOQ • 0.32 MB
KADMALIFINANCIAL.pdf
Other Document • 1.78 MB
TechnicalbidKADMALI.pdf
Tender Documents • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .