| 1 | L 1₹9.3 CrAccepted-AOC DHANAURI KUNWAR POST AKBARABAD TEHSIL NAJIBABAD DISTRICT BIJNOR UTTAR PRADESH | NAJIBABAD | BIJNOR | UTTAR PRADESH | ₹9.3 Cr | L 1 | Accepted-AOC LOWEST 1 |
| 2 | L 2₹9.3 Cr+₹3.1 L (0.33%)Rejected-Finance 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | ₹9.3 Cr+₹3.1 L (0.33%) | L 2 | Rejected-Finance LOWEST 2 |
| 3 | Rejected-Technical 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | - | - | Rejected-Technical Documents Not found as per NIT Terms and conditions |
| 4 | Rejected-Technical | - | - | Rejected-Technical Document Not found as per NIT Terms and conditions |
Tender Value
Refer Docs
EMD Value
₹18.6 L
Closing Date
5 Feb 2021, 5:00 pmClosed
S.E.I.W.C.Aligarh
25, LAL DIGGI, NEAR AMU CIRCLE, ALIGARH.
Construction of Two Lane Bridge over Lower Ganga Canal and Parallel Lower Ganga Canal at Ramghat in Distt. Bulandshahar.
2021_UPIDC_548110_1
03/SE/2020-21
Open Tender
Civil Works - Bridges
Item Rate
540 days
Ramghat
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,900
₹18.6 L
19 Feb 2021
23 Jan 2021
6 Feb 2021
23 Jan 2021
5 Feb 2021
23 Jan 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 30m and lift upto 1.5 m, as directed by Engineer-in-charge.
(M-10) Providing and laying in position Lean cement concrete of specified grade including cost of material, labour, T&P etc complete as directed by Engineer-in-charge.
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge in well kerbs.
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge in well kerbs.
Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge in well kerbs.
Providing & Fixing Centering & Shuttering in special type of R.C.C work such as curves, T . Beam, Bridges and sypones including cost of material, labour, T&P etc complete as directed by Engineer in charge.
Supplying and Laying TMT steel bar reinforcement as per approved drawing , including removal of rust , cutting,bending ,binding, placement with proper overlapping,providing chair etc required.the item includes cost of all material labour charges, providing & binding with 24 BWG binding wire ,T &P taxes etc. required for proper completion of the required work.
Sinking of 6 m extranal dia meter well (other than pneumatic method of sinking ) through all types of strata namely sandy soil clay soil and rock as shown against each case, complete as per drawing and technical specifications . Depth of sinking is reckoned from bed level. including cost of material, labour, T&P etc complete as directed by Engineer-in-charge.
Dewatering work for earth work , laying cement concrete work etc. including installations of low boring for providing dewatering with 100 H.P Capacity diesel pump set as per Engineer-in-charge.
Coffer Dam for checking running water made up of E.C bags filled with sand including cost of material, labour, T&P etc complete as directed by Engineer-in-charge.
Coffer Dam for checking running water made up of E.C bags filled with sand including cost of material, labour, T&P etc complete as directed by Engineer-in-charge.
Earth Work in filling with lead upto 195m including cost of material, labour, T&P etc complete as directed by Engineer-in-charge.
Supplying and Fixing of 7 mtr GI Octagonal Pole, street light and change over of approved make and required T&P complete in all respect.
Supplying of and Fixing marble bench mark plate size 150 x150 x25 mm with engraved letters including cost of all material , labour T&Petc. Complete.
Supplying and Making carriage and fixing name & year plate 300×300mm size with engraved letters including cost of all material , labour T&Petc. Complete.
Supplying and fixing wheel guard 150x150x900 mm size including cost of all material , labour T&Petc. Complete
Supplying of and Fixing 110 mm dia PVC pipe including cost of all material , labour T&Petc. Complete.
Providing Weep holes in abutment and wing walls including supply of all material, labour, T&P etc. required for proper complition of work.
Providing and Laying Cutting Edge of Mild Steel Weighting 40 Kg per meter for well Foundation complete as per Drawing and Technical specification. including cost of all material , labour T&P etc. Complete.
P/L Sand Filling in well complete as per Drawing and Technical Specifications. including cost of all material , labour T&P etc. Complete.
P/L Assuming depth of water 4.0 m and height of island 4.50 m including cost of all material , labour T&P etc. Complete.
P/F Strip seal Expansion Joint including cost of all material , labour T&P etc. Complete.
Supplying, fitting and fixing in position true to line and level POT-PTEE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH specifications complete as per drawing and approved Technical Specifications.
Dismentling C.C. work including disposal of material including cost of material, labour, T&P etc complete as directed by Engineer-in-charge.
P/L Reconstruction of CC M25 Lining including cost of material, labour, T&P etc complete as directed by Engineer-in-charge.
P/L Boulder pitching in launching apron complete as per Drawing and Technical specification. including cost of all material , labour T&P etc. Complete.
Supply of 80 mm thick precast cement conceret I -shape or zig-zag inter locking paver blocks with top layer of minimum 8 mm thickness having plain dimension 200X(160+120).
M/S AJAY KUMAR CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .