| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical due to compiled with technical bid |
| 2 | Accepted-Technical 01 SORANA NAKUR SAHARANPUR UTTAR PRADESH 247232 | SAHARANPUR | UTTAR PRADESH | 247232 | Accepted-Technical due to compiled with technical bid |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹11.4 L
Closing Date
5 May 2026, 3:00 pmClosed
SE AYODHAYA CIRCLE,AYODHAYA
CIRCLE OFFICE UPAVP, OFFICE COMPLEX ANGOORI BAGH AYODHAYA
CONSTRUCTION OF CENTER OF EXCELLENCE BUILDING AT SANJAY GANDHI POLYTECHNIC , JAGDISHPUR DISTRICT AMETHI (U.P.)
2026_UPHDB_1134766_1
597/M-10/128 dated 02.04.2026
Open Tender
Civil Works
Percentage
547 days
SANJAY GANDHI POLYTECHNIC, JAGDISHPUR DISTRICT A
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,850
EE CD-02 AYODHYA
₹11.4 L
8 May 2026
8 Apr 2026
5 May 2026
8 Apr 2026
5 May 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-incharge. All kinds of soil | |||||
| 2Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil | |||||
| 3Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete(plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (3) Treatment of top surface of plinth filling 5 liters/sqm With Chlorpriphos EC 20% with 1% concentration | |||||
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | |||||
| 5Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. Concrete of M25 grade with minimum cement content of 330 kg /cum | |||||
| 6Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 7Steel reinforcement for R.C.C. work ready to use “cut and bend” rebars of approved make from factory/workshop to construction site including placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more. | |||||
| 8Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift. | |||||
| 9Providing and laying LDPE Sheet Under Concreta including supply of all material ,labour and t&p etc.required for completion of work. | |||||
| 10Providing and laying Autoclaved Aerated concrete(AAC) blocks masonry with 150mm to 300 mm thick with Grade-1 AAC blocks of density 551 to 650 kg/cum conforming to IS:2185 (Part 3) in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for seperately). | |||||
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
F.pdf
Tender Documents • 27.88 MB
BOQ_2118450.xls
BOQ • 0.60 MB
T.pdf
Tender Documents • 14.03 MB
C.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .