Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAdmitted-Finance | ₹24.9 L | L1 | Admitted-Finance |
| 2 | L1₹24.9 LAdmitted-Finance | ₹24.9 L | L1 | Admitted-Finance |
| 3 | L2₹25.0 LAdmitted-Finance WARD NO 09 VPO CHHAPOLI UDAIPURWATI JHUNJHUNU RAJASTHAN 333302 | JHUNJHUNU | RAJASTHAN | 333302 | ₹25.0 L | L2 | Admitted-Finance |
| 4 | L2₹25.0 LAdmitted-Finance | ₹25.0 L | L2 | Admitted-Finance |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
9 Feb 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
SHAHPURA JAIPUR
Work of Repair and preventive maintenance of submersible pump sets and panels of TW including repairing rewinding and lowering un-lowering of pump sets in existing TW and existing PL irrespective of size including Leakage Repairing pollution control
2026_PHCJA_530157_3
NIT NO-57 To 61/2025-26/EE PHED DIV SHAHPURA JAIPUR
Open Tender
Civil Works - Water Works
365 days
SHAHPURA
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
EE PHED DIV SHAHPURA/MD RISL
₹50,000
Yes
27 Feb 2026
21 Jan 2026
10 Feb 2026
21 Jan 2026
9 Feb 2026
21 Jan 2026
11.0 HP to 12.5 HP (Qty=12 months x 50 TWs=600)
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department.
Minimum labor for a following KMs pipelines to be deployed.
up to 100 km One fitter- II & Two beldar (106 KM x 12 Months)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
TD-59.pdf
Tender Documents • 2.39 MB
BOQ_945301.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid