Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.6 L+₹75,000 (3.79%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹21.2 L+₹1.4 L (7.07%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹21.3 L+₹1.5 L (7.58%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
10 Mar 2025, 3:00 pmClosed
SE BRIDGES CHAMBER
GREATER CHENNAI CORPORATION AMMA MALIGAI 5TH FLOOR RIBON BUILDING
Selection of Consultant to prepare preliminary Design for one typical span of proposed Bridge, Land Plan Schedule and Preliminary Cost Estimate for the construction of Cable Stayed Bridge connecting Srinivasapuram and Urur kuppam across Adyar River
2025_CoC_529353_1
Br.D.C.No.B3/0031/2025
Limited
Civil Works
Works
GREATER CHENNAI CORPORATION
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹20,000
25 Mar 2025
3 Mar 2025
11 Mar 2025
4 Mar 2025
10 Mar 2025
4 Mar 2025
eProcurement System Government of Tamil Nadu Created By: KAVITHA SARAVANAN Created Date/Time: 11-Mar-2025 04:16 PM Tender Title: Selection of Consultant to prepare preliminary Design for one typical span of proposed Bridge, Land Plan Schedule and Preliminary Cost Estimate for the construction of Cable Stayed Bridge connecting Srinivasapuram and Urur kuppam across Adyar River Tender ID: 2025_CoC_529353_1
Tender Inviting Authority: Superintending Engineer/ Bridges
Name of Work: Selection of Consultant to prepare preliminary Design for one typical span of proposed Bridge, Land Plan Schedule and Preliminary Cost Estimate for the proposed construction of Cable Stayed Bridge connecting Srinivasapuram and Urur kuppam across Adyar river in lieu of the Broken Bridge in Div-171 & 174, Zone 13
Contract No:Br.D.C.No.B3/0031/2025
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Prime Meridian Surveys Pvt Ltd (GSTN-33AAECP5009R1Z4) BID ID -1265874 2000000.00 6.50 2130000.00 Twenty One Lakh Thirty Thousand
2.00 ALGATECH ENGINEERING AND CONSULTANTS PRIVATE LIMITED (GSTN-NA) BID ID -1266265 2000000.00 6.00 2120000.00 Twenty One Lakh Twenty Thousand
3.00 Boulevard Infradesign Consultants LLP (GSTN-NA) BID ID -1263486 2000000.00 -1.00 1980000.00 Ninteen Lakh Eighty Thousand
4.00 CROSS SURVEY & CONSULTANTS (GSTN-NA) BID ID -1265841 2000000.00 2.75 2055000.00 Twenty Lakh Fifty Five Thousand
Lowest Amount Quoted BY: Boulevard Infradesign Consultants LLP(1980000.00)
BOQ Summary Details Tender Title: Selection of Consultant to prepare preliminary Design for one typical span of proposed Bridge, Land Plan Schedule and Preliminary Cost Estimate for the construction of Cable Stayed Bridge connecting Srinivasapuram and Urur kuppam across Adyar River Tender ID: 2025_CoC_529353_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Boulevard Infradesign Consultants LLP (BID ID -1263486) 1980000.00 L1
2 CROSS SURVEY & CONSULTANTS (BID ID -1265841) 2055000.00 L2
3 ALGATECH ENGINEERING AND CONSULTANTS PRIVATE LIMITED (BID ID -1266265) 2120000.00 L3
4 Prime Meridian Surveys Pvt Ltd (BID ID -1265874) 2130000.00 L4
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_630349.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .