Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.7 L+₹51,426.11 (12.3%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.0 L+₹77,379.61 (18.5%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹5.1 L+₹86,035.61 (20.5%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹5.8 L+₹1.6 L (37.3%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SHRI PAWAN KUMAR L3 | RAMA YADAV L1 | m/s rakesh kumar L2 | M/S YAMUNA EARTH MOVERS L4 | NAND KISHOR L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds and moonj with disposal away from site. | 800 | M2 | 10 ₹8,000 Lowest | 21.87 ₹17,497.2 | 22.33 ₹17,864 | 23.97 ₹19,176 | 27.3 ₹21,840 |
| 2.00 | Cleaning thick bushes and thorny jungle without uprooting. | 1,500 | M2 | 2 ₹3,000 Lowest | 2.75 ₹4,124.34 | 2.8 ₹4,200 | 3 ₹4,500 | 3.43 ₹5,145 |
| 3.00 | Earth work in Silt clearance in bed of drain including lift upto 1.50m and lead upto 6.0 m by machines with rough/partial dressing. the earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by engineer in charge. (By Poclain) | 16,750 | M3 | 29 ₹4,85,750 | 23.75 ₹3,97,748.85 Lowest | 26.79 ₹4,48,732.5 | 28.76 ₹4,81,730 | 32.76 ₹5,48,730 |
Tender Value
₹8.7 L
EMD Value
₹18,000
Closing Date
25 May 2026, 11:00 amClosed
Executive Engineer
L.M.B.D.G.C., Mathura
Internal Clearance Work of Harnaul Escape Between Km 0.000 to Km. 4.500
2026_UPIDC_1148556_14
01EE Lower Mat 2026-27
Open Tender
Civil Works - Canal
Item Rate
10 days
L.M.B.D.G.C.
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹18,000
24 Jun 2026
20 May 2026
25 May 2026
20 May 2026
25 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds and moonj with disposal away from site. | 800 | M2 | - | - |
| 2 | Cleaning thick bushes and thorny jungle without uprooting. | 1,500 | M2 | - | - |
| 3 | Earth work in Silt clearance in bed of drain including lift upto 1.50m and lead upto 6.0 m by machines with rough/partial dressing. the earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by engineer in charge. (By Poclain) | 16,750 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_2150044.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .