Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-Finance | ₹4.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.7 LRejected-Finance | ₹4.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹5.0 LRejected-Finance | ₹5.0 L | L3 | Rejected-Finance L3 |
| 4 | L4₹5.1 LRejected-Finance | ₹5.1 L | L4 | Rejected-Finance L4 |
| 5 | L5₹5.8 LRejected-Finance | ₹5.8 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SHRI PAWAN KUMAR L3 | RAMA YADAV L1 | m/s rakesh kumar L2 | M/S YAMUNA EARTH MOVERS L4 | NAND KISHOR L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds and moonj with disposal away from site. | 800 | M2 | 10 ₹8,000 | 21.87 ₹17,497.20 | 22.33 ₹17,864 | 23.97 ₹19,176 | 27.3 ₹21,840 |
| 2.00 | Cleaning thick bushes and thorny jungle without uprooting. | 1,500 | M2 | 2 ₹3,000 | 2.75 ₹4,124.34 | 2.8 ₹4,200 | 3 ₹4,500 | 3.43 ₹5,145 |
| 3.00 | Earth work in Silt clearance in bed of drain including lift upto 1.50m and lead upto 6.0 m by machines with rough/partial dressing. the earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by engineer in charge. (By Poclain) | 16,750 | M3 | 29 ₹4.9 L | 23.75 ₹4.0 L | 26.79 ₹4.5 L | 28.76 ₹4.8 L | 32.76 ₹5.5 L |
Tender Value
₹8.7 L
EMD Value
₹18,000
Closing Date
25 May 2026, 11:00 amClosed
Executive Engineer
L.M.B.D.G.C., Mathura
Internal Clearance Work of Harnaul Escape Between Km 0.000 to Km. 4.500
2026_UPIDC_1148556_14
01EE Lower Mat 2026-27
Open Tender
Civil Works - Canal
10 days
L.M.B.D.G.C.
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹18,000
2 Jun 2026
20 May 2026
25 May 2026
20 May 2026
25 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds and moonj with disposal away from site. | 800 | M2 | - | - |
| 2 | Cleaning thick bushes and thorny jungle without uprooting. | 1,500 | M2 | - | - |
| 3 | Earth work in Silt clearance in bed of drain including lift upto 1.50m and lead upto 6.0 m by machines with rough/partial dressing. the earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by engineer in charge. (By Poclain) | 16,750 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_2150044.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid