Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC | L1 | Accepted-AOC Being L1 bidder | |
| 2 | L1₹1.2 LAccepted-AOC BHAGWATI NAGAR JAMMU | L1 | Accepted-AOC Being L1 bidder | |
| 3 | L2₹2.8 LRejected-Finance | L2 | Rejected-Finance Not being lowest bidder | |
| 4 | L3₹2.9 LRejected-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | L3 | Rejected-Finance Not being lowest bidder |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
25 Jun 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer MID Jammu
Repair replacement of the parts of the 200KVA voltage stabilizer of LIS Lower Malpur and Repair rewinding of 2 no.s Motors of pumping unit no-1 and 2 at LIS Manyal Brahmna along with allied works.
2021_IFC_126580_1
MID/J/e-NIT/2021-22/16
Open Tender
Repair and Maintenance Works
Lump-sum
10 days
Lower malpur Manyal Brahmana
As per tender notice
7 documents required · 7 mandatory
₹200
Executive Engineer MID Jammu
₹8,000
Yes
Jammu
28 Oct 2021
8 Jun 2021
26 Jun 2021
8 Jun 2021
25 Jun 2021
10 Jun 2021
8 Jun 2021 - 25 Jun 2021
9 Jun 2021
180 days
Amount
Repair/replacement of the parts of the 200KVA voltage stabilizer of LIS Lower Malpur along with other allied works.
Repair of 200 KVA manually operated voltage stabilizer along with allied works at LIS Lower Malpur. Job includes disconnecting all the electrical connections of the stabilizer both on LT transformer side and electrical motor side by way of removing old rusted thimbles along with nuts and bolts. Shifting of the stabilizer to the nearest roadside and loading of the same in the transport vehicle for further carriage to the workshop by employing hydraulic crane and manual labour at site. Repair to the voltage stabilizer at workshop by way of removing its top cover for extraction of inner assembly from the casing sump with the help of chain pulley block, tripod stand and manual labour. Removal of damaged coils 02 nos. along with terminal wires and insulation. Providing and Fitting of new 02 nos. copper coils of requisite size and specifications, new insulation material and nuts/bolts, varnishing drying in hot air circulation. Providing and fitting of new manually operated three phase single arm rotary switch along with plate, new set of brass bush rods for all individual phases on LT side. Lowering of the coils inside the casing. Providing/Fitting of new panel accessories by replacing the old one with new one. The job involves providing/fitting of 02 nos. voltmeters, draining out the old T.Oil from the stabilizer and heating to de moisturize it completely. Filling the de-moisturized T.Oil back into stabilizer and Providing/filling of new 30 litres of new T.Oil. Providing and fitting of new top cover gasket and cover plate nuts/bolts and complete reassembling of the stabilizer at workshop. Shifting back the voltage stabilizer to the site. Unloading the same at site employing hydraulic crane/manual labour and shifting it into the pump room for re-installation. Reinstallation of the voltage stabilizer in the pump room by fixing all the electrical connections, providing/fitting of new thimbles and nuts/bolts. Testing of the 200 KVA voltage stabilizer on part load and then on full load at site. Complete job including cost of materials, cost of rebate on account of old copper scrap, skilled / semi skilled labour charges and tools and tackles required during the execution of the job.
Dismantling the damaged 70HP manually operated oil immersed star-delta motor starter of Pumping Unit-II of LIS Batera from its installed position after disconnecting all electrical connections on input as well as output side. Carriage of the starter to workshop for repairs including providing and replacement of intermediate Bakelite rod, moving and fixed copper contact points, No volt coil, thimbles, overload protection relay and then back carriage to LIS for re-installation, commissioning and testing on full load and no load condition. Job also includes Providing and filling of approx. 10liters of fresh transformer oil after de-moisturizing of the old T oil. Complete job including cost of material, skilled labour charges and transportation charges involved.
Replacement of the multi strand copper cable 25mm2 at LIS Batera of pumping unit no.3 from motor to starter. The Job involves removal of the old burnt out copper cable from motor to starter measuring approx. 28mtrs. and providing/fitting of the new cable of the same specification as per sample. The job also involves providing/fitting of copper thimbles as per sample along with other allied material at site. Job also includes making connections at motor side and starter by means of thimbling on each side of the cable with the help of crimping tool and then insulating them using cotton tape/insulation tape and using nuts & bolts of suitable size. Complete Job includes cost of skilled /semi-skiled labour, tools & tackles charges, hire and transportation charges. Complete job.
Rebate on Old Parts
Repair/rewinding of 2 no.s Motors of pumping unit no-1 and 2 along with allied works at LIS Manyal Brahmna
Dismantling of the damaged & burnt 40HP electric motors of Pumping unit no-1 and 2 of LIS Manyal Brahmna from base frame, pump & starter electrical connections, head load to nearest road by manual labour & loading in the vehicle for further transportation to workshop for repairs/rewinding at Jammu. Back carriage to site after repairs and reinstallation, commissioning and testing on load conditions. Complete job
Dismantling of the 2no.s damaged 40HP Motors at workshop for extraction of burnt/ damaged windings, cleaning of stator slots and complete rewinding of the motors with new copper wires of requisite gauge and specifications, standard make. Providing/ fitting of new insulation, packing material, then varnishing with superior quality varnish & drying in oven in controlled temperature. Complete job includes cost of material and labour charges with hiring charges of tools & tackles. Repairs to rotors of both motors by providing/fitting of new bearings (DE & NDE) after rebuilding of the rotor shafts and finishing to bearing sizes, making new keyway for coupling, providing/fitting of bearing end cover plates. Complete greasing of the bearing, providing/fitting of new cooling fan and side strainers. Complete job including cost of material and labour charges.
Replacement of the multi strand copper cable 25mm2 at LIS Manyal Brahmna of pumping unit no.1 from motor to starter. The Job involves removal of the old burnt out copper cable from motor to starter measuring approx. 30mtrs. and providing/fitting of the new cable of the same specification as per sample. The job also involves providing/fitting of copper thimbles as per sample along with other allied material at site. Job also includes making connections at motor side and starter by means of thimbling on each side of the cable with the help of crimping tool and then insulating them using cotton tape/insulation tape and using nuts & bolts of suitable size. Complete Job includes cost of skilled /semi-skiled labour tools & tackles charges, hire and transportation charges. Complete job.
Dismantling the damaged 50 HP manually operated oil immersed star-delta motor starter of Unit-1 and 2 from installed position after disconnecting all electrical connections on input as well as output side. Carriage of the starter to workshop for repairs; replacement of intermediate Bakelite rod, moving and fixed contact points, No volt coil, thimbles, overload protection relay, back carriage to LIS for re-installation, commissioning and testing on full load and no load condition. Providing and filling of approx. 10 litres of transformer oil to both starters after de-moisturizing .Complete job including cost of material, labour charges and transport charges involved.
Rebate on Old Parts
PERFECT ELECTRICAL WORKS
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
G S ENGINEERING WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .