Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹45,711
Closing Date
8 Oct 2026, 3:00 pm
Executive Engineer,CD-I, A.P.W.D., SVP
Executive Engineer,CD-I, A.P.W.D., SVP
Construction of retaining wall of length 50.0 mtr behind Type-III Block Qtr No.5,6,7and 8 and Type-IV Block Qtr No.1,2,3and4 at DSS Marine colony under CD-I,APWD, Sri Vijayapuram.
2026_APWD_24790_1
32/NIT/DB/CD-I/SVP/26-27
Open Tender
Civil Works - Buildings
Percentage
90 days
DOLLYGUNJ
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹45,711
23 Sept 2026
23 Sept 2026
8 Oct 2026
23 Sept 2026
8 Oct 2026
23 Sept 2026
23 Sept 2026 - 1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.1 | All kinds of soil. | 156.5 | Cum | 334.8 | ₹52,396.2 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 79.4 | Cum | 181.5 | ₹14,411.1 |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 330 | sqm | 16.3 | ₹5,379 |
| 4Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | |||||
| 4.1 | Beyond 30 cm girth upto and including 60 cm girth | 2 | each | 490 | ₹980 |
| 4.2 | Beyond 60 cm girth upto and including 120 cm girth | 2 | each | 2,191.2 | ₹4,382.4 |
| 5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 5.1 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 11 | Cum | 9,376.1 | ₹1,03,137.1 |
| 6 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 34.5 | sqm | 1,022.85 | ₹35,288.33 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
Tendernotice_2.pdf
PDF • 24.55 MB
TenderdocretainingwallDSS.pdf
Tender Documents • 24.53 MB
BOQ_26238.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .