| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Finance | ₹10.8 L | L1 | Admitted-Finance |
| 2 | L2₹11.0 L+₹14,650.63 (1.35%)Admitted-Finance | ₹11.0 L+₹14,650.63 (1.35%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R.S.MURUGESAN L2 | A SURYAKUMARAN L1 |
|---|---|---|---|---|---|
| 1.001) Construction of Girls Toilet P.U.E School @ Thalvallam H/O P.K.Hills Melnadu | |||||
| 2.00 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 24.12 | Cu.m | 395 ₹9,527.4 | 350 ₹8,442 Lowest |
| 3.00 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers Gadebeam aall Allround | 1.44 | Cu.m | 145 ₹208.8 | 125 ₹180 Lowest |
| 4.00 | Flooring Concrete 1:4:8 (One cement, Four sand and Eight hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers. | 7.46 | Cu.m | 7,500 ₹55,950 | 7,300 ₹54,458 Lowest |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 4.98 | Cu.m | 175 ₹871.5 | 160 ₹796.8 Lowest |
| 6.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid). | |||||
| 7.00 | RCC roof slab, lintel, beam | 61.62 | Sqm | 1,500 ₹92,430 | 1,470 ₹90,581.4 Lowest |
| 8.00 | Sides | 15.66 | Sqm | 785 ₹12,293.1 | 735 ₹11,510.1 Lowest |
| 9.00 | Supplying fabricating and placing in position mild steel or nibbled for steel for all reinforced cement concrete works as per the desing given including cost of steel and binding wire in all floors etc. complete complying with standard specification (MS rods or RTS bars will be supplied department sally at section stores and cost will be recovered at issue rate). The binding wire shall be supplied by the Contractor. | 0.84 | MT | 1,09,000 ₹92,105 | 1,06,110.5 ₹89,663.37 Lowest |
| 10.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 8.53 | Cu.m | 11,950 ₹1,01,933.5 | 11,752.03 ₹1,00,244.82 Lowest |
Tender Value
₹11 L
EMD Value
₹11,000
Closing Date
10 Jun 2026, 3:00 pmClosed
BDO(BP)
BDO, P.N.Palayam
Construction of Girls Toilet P.U.E School at Thalvallam H/O P.K.Hills Melnadu Pedhanaickenpalayam Block In Salem District Focus Block Development Programme Savings Fund - 2025-26
2026_RDTN_677814_2
Roc.No.700/2024/A3
Open Tender
Civil Works
Item Wise
120 days
BDO, P.N.Palayam
As per tender document
3 documents required · 3 mandatory
₹0
₹11,000
11 Jun 2026
21 May 2026
10 Jun 2026
21 May 2026
10 Jun 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1) Construction of Girls Toilet P.U.E School @ Thalvallam H/O P.K.Hills Melnadu | - | - | - | - |
| 2 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | - | Cu.m | - | - |
| 3 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers Gadebeam aall Allround | 1 | Cu.m | - | - |
| 4 | Flooring Concrete 1:4:8 (One cement, Four sand and Eight hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers. | - | Cu.m | - | - |
| 5 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | - | Cu.m | - | - |
| 6 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid). | - | - | - | - |
| 7 | RCC roof slab, lintel, beam | 1 | Sqm | - | - |
| 8 | Sides | - | Sqm | - | - |
| 9 | Supplying fabricating and placing in position mild steel or nibbled for steel for all reinforced cement concrete works as per the desing given including cost of steel and binding wire in all floors etc. complete complying with standard specification (MS rods or RTS bars will be supplied department sally at section stores and cost will be recovered at issue rate). The binding wire shall be supplied by the Contractor. | - | MT | - | - |
| 10 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 1 | Cu.m | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
02.pdf
Tender Documents • 1.29 MB
BOQ_814364.xls
BOQ • 0.31 MB
tenderpostponed.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .