| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 CrAccepted-AOC | ₹1.8 Cr | 1 | Accepted-AOC AOC |
| 2 | Rejected-Technical | - | - | Rejected-Technical Non responsive due to bid capacity |
Tender Value
₹1.8 Cr
EMD Value
₹3.7 L
Closing Date
12 Mar 2020, 5:00 pmClosed
Superintending Engineer
11th Circle HPPWD Rampur Bsr Distt . Shimla HP
Upgradation of link road from NH05 to Shalkhar Km 0.000 to 2.390 SH RODF C.O R.wall B.wall Parapets W beam metal crash barrier V shape PCC side drain, solid cause way Metalling and Tarring including five year maintenance HP0560 Pooh
2020_CEHP_90562_3
11010-60 dated 17.01.2020
National Competitive Bid
Civil Works - Roads
Item Rate
365 days
Kalpa
Please refer Tender documents.
26 documents required · 26 mandatory
₹5,000
EE Kalpa
₹3.7 L
25 Jul 2020
27 Feb 2020
13 Mar 2020
27 Feb 2020
12 Mar 2020
27 Feb 2020
Amount
Excavation in earthwork in hilly area all heights and depths, in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution, etc. and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation, including rock excavation shall be carried out true to lines, grades, side slopes, width, camber, super-elevation and level as shown on the drawings or as directed by the Engineer-in-charge, in conformity with the requirement of technical specification for Rural Road, clause 16.2 of General Conditions for Contract to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner including arrangement of dumping site, trimming, filling of unevenness, blindage and finishing of the road to specified dimensions or as directed by the Engineer-in charge for smooth riding. The recovery for stones, whether useful or not, for nil cum.( i. e Cubic Meter ) @ Rupee170/= only(Rupees .One hundred seventy) per cubic meter shall be effected on pro rata basis in all circumstances. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases
Earth work in excavation for structures in all depths as per drawings and technical specification for Rural road , Clause 305.1 specifications (latest edition) including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge. Stacking of materials useful for construction at suitable sites and safe disposal of unserviceable cut materials in specified manner trimming filling of unevenness blind edge and finishing of the road to specified dimension or as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be removed by suitable diversion bailing out or dewatering as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases.
Providing and Laying concrete Mechanically mixed and vibrated for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 ( PCC 1: 6: 12 ) ( One cement: Six sand :Twelve graded stone 40 mm(Forty millimeters) nominal size for plain concert in foundation and plinth or similar work complete as per drawing and technical specification for rural roads and curing complete including the cost of form work and hauling of materials in all leads and lifts and as per entire satisfaction and direction of Engineer-in-charge.
Providing and laying concrete Mechanically mixed and vibrated PCC M-15(Fifteen) nominal mix 1:2.5.:5 ( One cement: Two and half sand :five graded stone 20 mm(twenty millimeters) nominal size for plain concert in foundation and plinth or similar work complete as per drawing and technical specification for rural roads , Clause 802,803,1202 and 1203 and curing complete including the cost of form work including hauling of materials in all leads and lifts and as per entire satisfaction and direction of Engineer-in-charge.
Providing and laying concrete Mechanically mixed and vibrated PCC M-10(Ten) nominal mix 1:3.6 ( One cement: Three sand :six graded stone 20 mm(twenty millimeters) nominal size for plain concert in foundation and plinth or similar work complete as per drawing and technical specification for rural roads , Clause 802,803,1202 and 1203 and curing complete including the cost of form work including hauling of materials in all leads and lifts and as per entire satisfaction and direction of Engineer-in-charge.
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 including and hauling of materials in all leads and lifts and as per entire satisfaction of Engineer-in-charge.
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.Random Rubble Masonry In cement-mortar 1:6 ( One cement : six sand) and curing complete including and hauling of materials in all leads and lifts and as per entire satisfaction of Engineer-in-charge.
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.Random Rubble Masonry in cement-mortar 1:4 ( One cement : four sand) and curing complete including and hauling of materials in all leads and lifts and as per entire satisfaction of Engineer-in-charge.
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600mm ( six hundred millimeter ) with smaller size towards the soils and bigger size towards the wall and providing over the entire surface behind abutment wing wall return walls, to the full height compacted to firm condition complete as per drawings and technical specification Rural Road , clause 1204.3.8 including hauling of materials in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 including hauling of materials in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
Providing, and laying reinforced cement concrete 900mm diameter (Nine Hundred millimeter) pipe NP2 including jointing for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 (one cement: two sand) but excluding excavations, protection works, back filling, concrete and masonry works in head walls and parapets as per drawings and technical specifications clause 1108 including the cost of form work and hauling of materials through all modes of transportation with in all leads and lifts and as per the entire satisfaction and direction of Engineer-in-Charge.
Providing and laying flooring laid over cement concrete bedding complete as per drawing and technical specification clause 1303 Rubble Stone laid in cement mortar 1:3 (1 cement :3 sand) including the cost of form work and hauling of materials through all modes of transportation with in all leads and lifts and as per the entire satisfaction and direction of Engineer-in-Charge.
Preparation of sub-grade by dressing to camber, earth work for the cutting involved for sub grade to be paid for separately depending upon the classification of soil completed as per HP.PWD. Specifications including the hauling of materials through all modes of transportation with in all leads and lifts and as per the entire satisfaction and direction of Engineer-in-Charge.
Consolidation of sub grade with road roller including making good the undulation etc. with earth or quarry soil etc. and rerolling the sub-grade completed as per HP.PWD., Specification including hauling of materials through all modes of transportation with in all leads and lifts and as per the entire satisfaction and direction of Engineer-in-Charge.
Construction of sub grade and earthen shoulders with approval material obtained from borrow pits with all leads and lifts, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 including hauling of materials in all leads , lifts as per the entire satisfaction and direction of Engineer-in-Charge as per Technical Specification clause 303.1.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. including hauling of materials in all leads , lifts as per the entire satisfaction and direction of Engineer-in-Charge
Providing laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel 80-100 KN static roller in stages to proper grade and camber, applying and brooming stone screening/binding materials to fill- up the interstices of coarse aggregate, watering and compacting to the required density grading-II as per technical specification clause 405 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-Charge. WBM Grading -II (63mm to 45mm).
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel 80-100 KN static roller in stages to proper grade and camber, applying and brooming stone screening/binding materials to fill- up the interstices of coarse aggregate, watering and compacting to the required density grading-III as per technical specification clause 405 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-Charge. WBM Grading -III (53mm to 22.4 mm size)
Providing and applying primer coat with Bitumen emulsion (SS-I) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means as per technical specification clause 502 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-Charge.
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rates of 0.30 Kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per technical specification clause 503 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge.
Providing, laying and rolling of open-graded premix carpet of 20 mm to thickness composed of 13.2 mm 5.6 mm aggregate using VG-10 (VG-10) @ 14.60 kg per 10 sqm) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant. Laying and rolling with a three wheel 80/100 KN static roller capacity, finished to required level and grade to be followed by seal coat of type B as per technical specification clause 508 including haulaging of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-Charge.
Providing and laying seal coat sealing the voids in bituminous surface laid to the specified levels, grade and cross fall bitumen (VG-10) @ 6.80 kg per 10 sqm as per technical specification clause 510 including haulaging of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-Charge. using VG-10
Reinforced cement concrete M-15 (fifteen) grade kilometre stone/local stone of standard design as per IRC:25 fixing in position including finishing and lettering but excluding painting as per drawing and technical specification clause-1703 including hauling of materials through all modes of transportation with in all leads and lifts and as per the entire satisfaction and direction of Engineer-in-Charge. i) Ordinary/ Kilometer stone
ii) 200meter stone
iii) 5th KM stone
P/F of typical PMGSY informatory board with logo as per MORD specifications and drawing. Three MS plates of 1.6mm (one point six millimeter ) thick, top and middle plates duly welded with MS flat iron 25mm X5mm (twenty five into five millimeter ) size on back on edges. The lower plate will be welded with MS angle iron frame of 25mmX25mmX5mm. (twenty five in to twenty five into five millimeter) The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded two nos. 75mmX75mm (seventy five in to seventy five millimeter) of 12SWG sheet tubes post duly embedded in C.C. M-15 grade blocks of 450mmX450mmX600mm, (four hundred fifty into four hundred fifty into six hundred millimeter) 600 mm (six hundred) below ground level. The top most diamond plate will be welded to middle plate by 47mmX47mm of 12S WG steel plate tube. All MS will be stove enameled on both sides lettering and painting arrows border etc, will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All section of framed post and steel tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and Annexure 1700.1 including the cost of form work and hauling of materials through all modes of transportation with in all leads and lifts and as per the entire satisfaction and direction of Engineer-in-Charge.
Providing and fixing recto reflectors cautionary mandatory and informatory sign as per IRC : 67 made of encapsulated lence type reflective sheeting wide clause 1701.2.3 fixed over aluminum sheeting 1.5mm (one point five millimeter) thick supported on a mild steel angle iron 75mm x 75mmx 6mm (seventy five in to seventy five into six millimeter) firmly fixed to the ground by means of properly designed foundation with M-15 (fifteen) grade cement concrete 450x450x600mm (four hundred fifty into four hundred fifty into six hundred millimeter) 600 mm (six hundred) below ground level as per drawing and technical specification rural roads including the cost of form work and hauling of materials through all modes of transportation with in all leads and lifts and as per the entire satisfaction and direction of Engineer-in-Charge. i) 600 mm circular Mandatory sign Board
ii) 600 mm Square direction and place sign board
iii) 900 mm equilateral triangle cautionary sign board
Routine Maintenance after completion of construction work as per terms and condition of bid document of contract data to general condition of contract and technical specifications of Ministry of Rural Development for rural roads , (Two thousand Four) for rural roads including hauling / carriage of all labour equipment and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction of the Engineer-in-Charge for 1st Year
Routine Maintenance for 2nd Year
Routine Maintenance for 3rd Year
Routine Maintenance for 4th Year
Routine Maintenance for 5th Year
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .