Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | ₹5.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.0 LRejected-AOC | ₹6.0 L | L2 | Rejected-AOC L2 |
| 3 | L3₹7.1 LRejected-AOC | ₹7.1 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | NETHAJI L3 | VICTORY CONSTRUCTIONS L2 | P PICHANDI L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork Excavation in hard soil Eathwork excavating and depositingwith initial lead of 10m span and lift 2m span ( for roads supply channels desiliting of MI Tanks, ponds & kulam) | 108.75 | cum | 300 ₹32,625 | 110 ₹11,962.50 | 213.66 ₹23,235.53 |
| 2.00 | Cement mortor 1:4:8 mix using 40mm ISS METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE and all labour charges for mixing laying and curing etc complete for 10cm | 7.76 | cum | 5,375.78 ₹41,716.05 | 5,375.78 ₹41,716.05 | 4,354.38 ₹33,789.99 |
| 3.00 | Cement concrete 1:3:6 mix using 40mm ISS Metal including cost and conveyance of all materials to site and all labour charges for mixing laying and curing for 10 cum and all labour charges etc | 59.76 | sqm | 5,682.63 ₹3.4 L | 4,460.44 ₹2.7 L | 4,602.93 ₹2.8 L |
| 4.00 | Centering Below GL., supplying and erecting centering for sides and soffits including necessary supports and struggling upto 3.29m height for plane Surfaces centre, labour Charges etc., complete | 143.25 | sqm | 547.5 ₹78,429.38 | 547.5 ₹78,429.38 | 443.48 ₹63,528.51 |
| 5.00 | Centering Above GL., supplying and erecting centering for sides and soffits including necessary supports and struggling upto 3.29m height for plane Surfaces centre, labour Charges etc., complete | 12.13 | sqm | 1,095 ₹13,282.35 | 1,095 ₹13,282.35 | 886.95 ₹10,758.70 |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS metal (using M-Sand ) including cost and conveyance of all materials to site and labour charges for mixing laying and curing etc complete for 10cum | 4.24 | cum | 6,777.38 ₹28,736.09 | 6,777.38 ₹28,736.09 | 5,489.68 ₹23,276.24 |
| 7.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixinglaying and curing etc complete (above basement) | 3.31 | cum | 9,280.91 ₹30,719.81 | 9,280.91 ₹30,719.81 | 7,517.54 ₹24,883.06 |
| 8.00 | Supplying and fabricating and Placing in position of mild / tor steel for all RCC Works as per the design given including cost of all steel binding wire and labour for fabrications etc., complete complying with standard specification | 0.4 | MT | 91,938.4 ₹36,775.36 | 91,938.4 ₹36,775.36 | 74,470.1 ₹29,788.04 |
| 9.00 | GST 18% | 1 | No | 1,08,338.04 ₹1.1 L | 91,471.94 ₹91,471.94 | 87,179.61 ₹87,179.61 |
Tender Value
Refer Docs
EMD Value
₹7,160
Closing Date
10 Mar 2026, 3:00 pmClosed
The Block Development officer ARCOT
The Block development office, Arcot
Construction of culvert for 1.5m span at Sudukadu Pathway in Sambasivapuram in Sambasivapuram Panchayat
2026_RDTN_671904_1
A1/670/2026
Open Tender
Civil Works
30 days
The Block development office, Arcot
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,160
14 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
Earthwork Excavation in hard soil Eathwork excavating and depositingwith initial lead of 10m span and lift 2m span ( for roads supply channels desiliting of MI Tanks, ponds & kulam)
Cement mortor 1:4:8 mix using 40mm ISS METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE and all labour charges for mixing laying and curing etc complete for 10cm
Cement concrete 1:3:6 mix using 40mm ISS Metal including cost and conveyance of all materials to site and all labour charges for mixing laying and curing for 10 cum and all labour charges etc
Centering Below GL., supplying and erecting centering for sides and soffits including necessary supports and struggling upto 3.29m height for plane Surfaces centre, labour Charges etc., complete
Centering Above GL., supplying and erecting centering for sides and soffits including necessary supports and struggling upto 3.29m height for plane Surfaces centre, labour Charges etc., complete
Cement concrete 1:2:4 mix using 20mm ISS metal (using M-Sand ) including cost and conveyance of all materials to site and labour charges for mixing laying and curing etc complete for 10cum
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixinglaying and curing etc complete (above basement)
Supplying and fabricating and Placing in position of mild / tor steel for all RCC Works as per the design given including cost of all steel binding wire and labour for fabrications etc., complete complying with standard specification
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_807460.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_807460.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid