Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.5 L
EMD Value
₹21,000
Closing Date
28 Jun 2026, 5:00 pmClosed
Ex. Eng., Meerut Division Ganga Canal, Meerut
Office of Ex. Eng., Meerut Division Ganga Canal, Meerut
01/EE/2026-27 Reconstruction of VRB at Km. 1.030 of Nagla Akkhu Drain in Distt. Ghaziabad (Lot-4)
2026_UPIDC_1150705_7
01/EE/2026-27
Open Tender
Civil Works - Canal
Piece-work
90 days
As per Tender Notice
As per Tender Notice
2 documents required · 2 mandatory
₹944
₹21,000
24 Jul 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
28 Jun 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling bricks work or stone work and cement concrete in cement mortar and inlcuding stacking of material with in a distance of 60M as per direction of Engineer-in-Charge. | 1 | CuM. | - | - |
| 2 | Dismantling reinforced cement concrete inlcuding stacking of dismantled material with in a distance of 60M as per direction of Engineer-in-Charge. | - | CuM. | - | - |
| 3 | Earthwork in embankment for making bundha and ramp by power transported earth with a lead of 200 m to 1.00 km including excavation, loading, unloading, manual compaction and dressing of the surface upto the required level & slope and all lift etc. complete. | - | CuM. | - | - |
| 4 | RCC 1200 mm dia Hume pipe NP-3 (S&S) I.S.I. Mark including loading, unloading, and shifting. | - | RM. | - | - |
| 5 | Earth work in Exacavation of foundation in all type of soil with lead 30 m and lift 1.50 m including proper disposal of surplus earth as directed by the Engineer in charge. | - | CuM. | - | - |
| 6 | Providing & laying C.C. 1:3:6 with cement, coarse sand & well graded stone ballast (22.50 - 45.00) mm including all cost of material, labour T&P etc complete. | - | CuM. | - | - |
| 7 | First class brick work in 1:4 C.M including cost of all material, labour, T & P etc. | - | CuM. | - | - |
| 8 | Cement pointing 1:2 (Struck deep) on brick masonry including cost of all material, labour, T & P etc. | 0.16 | SqM. | - | - |
| 9 | Ordinary centering and shuttering for C.C. / R.C.C. Work | 0.52 | SqM. | - | - |
| 10 | Providing steel reinforcement including cost of material, labour, T&P, bending, binding and placing in position complete | - | MT. | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.16 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.10 MB
Tendernotice_2.pdf
PDF • 2.11 MB
BOQ_2180001.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .