Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAMALAKSHMANAN TNEB CONTRACT L1 |
|---|---|---|---|---|
| 1.00 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to bagayam section work spot upto 10 kms | 21 | Per Pole | 2,300 ₹48,300 Lowest |
| 2.00 | Excavation and erection and fixing of line metarials of 9.0m pole | 1 | Per Pole | 1,700 ₹1,700 Lowest |
| 3.00 | Excavation and erection and fixing of line metarials of 8.0m pole | 20 | Per Pole | 1,300 ₹26,000 Lowest |
| 4.00 | Excavation, erection of stay set complete for HT/LT pole | 15 | each | 1,000 ₹15,000 Lowest |
| 5.00 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 2.64 | Per Km | 2,300 ₹6,062.8 Lowest |
| 6.00 | Stringing of 7/3.15 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.21 | Per Km | 2,800 ₹599.2 Lowest |
| 7.00 | Fixing of 3 Phase cross arm with line materials | 16 | each | 240 ₹3,840 Lowest |
| 8.00 | pole earthing for various size of pole | 12 | per pole | 200 ₹2,400 Lowest |
| 9.00 | Fixing of Lt Shackle | 30 | each | 50 ₹1,500 Lowest |
| 10.00 | Fixing of LT Pin Insulator | 12 | each | 30 ₹360 Lowest |
Tender Value
Refer Docs
Closing Date
28 Jul 2026, 2:00 pmClosed
EE Vellore
Gandhi Nagar katpadi
Works Contract for Extension of supply works in HTLT feeders for erection poles ,transporting of poles, paving HTLT Line in various work orders in respect of Assistant Engineer O M Bagayam section in AEE OmUrban II Vellore Sub Division of Vellore
2026_EB_686111_1
EEVLR010
Limited
Electrical and Maintenance Works
Works
180 days
bagayam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
1 Aug 2026
16 Jul 2026
29 Jul 2026
16 Jul 2026
28 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to bagayam section work spot upto 10 kms | 21 | Per Pole | - | - |
| 2 | Excavation and erection and fixing of line metarials of 9.0m pole | 1 | Per Pole | - | - |
| 3 | Excavation and erection and fixing of line metarials of 8.0m pole | 20 | Per Pole | - | - |
| 4 | Excavation, erection of stay set complete for HT/LT pole | 15 | each | - | - |
| 5 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 2.64 | Per Km | - | - |
| 6 | Stringing of 7/3.15 AAAC size of conductor (circuit length as mentioned in sanction copy) | 0.21 | Per Km | - | - |
| 7 | Fixing of 3 Phase cross arm with line materials | 16 | each | - | - |
| 8 | pole earthing for various size of pole | 12 | per pole | - | - |
| 9 | Fixing of Lt Shackle | 30 | each | - | - |
| 10 | Fixing of LT Pin Insulator | 12 | each | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_824750.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .