Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.5 LAccepted-AOC AT BIRADARPADA W NO 04 P O TALCHER TOWN DIST ANGUL | ANGUL | ODISHA | ₹49.5 L | L1 | Accepted-AOC Successful |
| 2 | L2₹54.4 LRejected-AOC AT BIRADARPADA W NO 04 P O TALCHER TOWN DIST ANGUL | ₹54.4 L | L2 | Rejected-AOC Unsuccessful |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Work experience has not submitted |
Tender Value
₹49.5 L
EMD Value
₹49,536
Closing Date
15 Jul 2026, 5:00 pmClosed
Executive Officer, Talacher Municipality
At - Municipal Office, P.O. Talcher Town, Dist.Angul
Construction and development of Hatisala Gate and surrounding area in W.No.3 and 5
2026_ORULB_134078_16
TCRM - 8 / 2026-27
Open Tender
Civil Works - Others
Percentage
150 days
Talacher Municipal Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹49,536
Yes
16 Aug 2026
2 Jul 2026
17 Jul 2026
2 Jul 2026
15 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all kinds of soil with lead & lift etc., including leveling and dressing of bed etc., complete | 0.2 | cum | 299.53 | ₹59.91 |
| 2 | Filling in foundation & plinth with sand watered & rammed including cost, conveyance and royalty of all materials, cost of all labour, T&P, etc., complete | 1 | cum | 725.95 | ₹725.22 |
| 3 | P.C.C (1:3:6) using 4cm size b.h.g (HB) metal including cost, conveyance and royalty of all materials, cost of all labour, T&P, etc., complete | 1 | cum | 5,989.99 | ₹5,984 |
| 4 | R.C.C. M-20 cement concrete with using 12mm to 20mm size down graded chips including all cost conveyance hoisting laying taxes, royalty, watering, curing, etc. excluding cost of iron rod & centering shuttering. | 0.6 | cum | 6,039.72 | ₹3,617.79 |
| 5 | Labor for M.S. reinforcement for RCC work including cutting, bending, binding with all cost of labour, T&P, cost of binding wire, etc. complete. | 0.4 | qntl | 8,530.25 | ₹3,412.1 |
| 6 | Rigid smooth centering & shuttering for CC or R.C.C. work including false work & dismentalling then after casting with all cost etc. complete. | 1 | sqm | 248.67 | ₹248.42 |
| 7 | Supplying all materials, labour and T&P for Fly Ash brik work using fly ash brick of size 25cm x 12cm x 8 cm having crushing strength 75 to 99 kg / cm2 in cement mortal (1:6) in F& P, watering and curing etc. as per specification and direction of EIC | - | cum | 5,525.28 | - |
| 8 | Supplying all materials, labour and T&P for Fly Ash brik work using fly ash brick of size 25cm x 12cm x 8 cm having crushing strength 75 to 99 kg / cm2 in cement mortal (1:6) in Superstructure, watering and curing etc. as per specification and direction of EIC | - | cum | 5,558.61 | - |
| 9 | 12mm thick C.P. (1:6) over brick work etc. all complete | - | sqm | 188.31 | - |
| 10 | Supplying all materials, labour and T&P to fixing tiles in floor, treads of steps, landing on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixing with pigment to match the shade of the tiles including rubbing and polishing including cost of granite tiles (20mm thick) etc. as per specification and direction of EIC | - | sqm | 3,347.4 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
DTCN.pdf
Tender Documents • 0.79 MB
BOQ_599256.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].