RequiredExperience with Government
RequiredAnnual Turnover
RequiredCertificate (Requested in ATC)
RequiredOEM Authorization Certificate
RequiredOEM Annual Turnover Bid to RA enabled Yes Note: 1. OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years
Requiredending on 31st March of the previous financial year
Requiredshould be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant/Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution/incorporation of the OEM is less than 3 year old
Requiredthe average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. Layer 3 - Access Switch ( 1 pieces ) Technical Specifications 1/8 * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) Specification Maximum Number of Access/Downlink Ports 24 24
Required48
Required32 Or higher Type of Switch Non PoE Non PoE
RequiredPoE
RequiredPoE+
RequiredUPoE
RequiredPoE++ Or higher Number of 10/100/1000 Base-T Ports 24 24
Required48
Required32 Or higher Number of Multi- Gigabit Ports 0 0
Required4
Required8
Required12
Required24
Required48
Required2
Required16
Required32 Or higher Number of 1 G Base T Ports (Uplink) 0 0
Required2
Required4
Required8
Required12
Required16
Required24
Required32
Required48 Or higher Number of 1 G SFP Base X Port (Uplink) 4 4
Required8
Required12
Required16
Required24
Required32
Required48 Or higher Number of 10 G Base T Port (Uplink) 0 0
Required2
Required4
Required8
Required12
Required16
Required24
Required32
Required48 Or higher Number of 10 G SFP+ Port (Uplink) 0 0
Required2
Required4
Required8
Required12
Required16
Required24
Required32
Required48 Or higher Number of 40 G QSFP+ Port (Uplink) 0 0
Required2
Required4
Required8
Required12
Required16
Required24
Required32
Required48 Or higher Number of 100 G QSFP 28 Port (Uplink) 0 0
Required1
Required2
Required4
Required6
Required8
Required12
Required16
Required24
Required48 Or higher Management Port (RJ 45/RS 232/USB) Yes Yes Or higher RAM (MB) 4096 * Flash Memory (MB) 2048 * 9K MTU Supported (Minimum) Yes * Console Port Yes * Redundant Power supply No Yes
RequiredNo Or higher Redundant Power Supply Type Internal * Redundant Power Supply (Hot Swappable) No * Redundant Fan Yes Yes Or higher Redundant Fan (Hot Swappable) Yes * Number of Open slot for additional Interface 1 * 2/8 Card Operating System Yes * Dedicated Stacking Yes * Stacking Bandwidth (Gbps) 320 * Switching Capacity Forwarding Bandwidth (Non Blocking/Line Rate Wired Speed) 2x (Numbers of access ports + Number of Uplink Ports) (Gbps) 92 More than 92.0 Or higher Throughtput Forwarding Performance (MPPS) 68.4 More than 68.4 Or higher Layer 2 Protocols 802.1Q VLAN
RequiredLAG * Number of VLAN Supported 4000 * Number of VLAN IDs Supported 4000 * Number of IPV4 Routes 20000 * Number of IPV6 Routes 5000 * Number of Mac Address Supported (k) 32 * Basic Layer-3 Protocol from day 1 Static Routing
RequiredRIPv1
RequiredRI Pv2
RequiredBGP
RequiredOSPFv2
RequiredOSPFv 3
RequiredRIPng * Advance Layer-3 Protocol from day 1 OSPFv2
RequiredOSPFv3
RequiredPBR
RequiredB GP
RequiredBGP4
RequiredIS-IS
RequiredPIM- SM
RequiredPIM-SSM * Premium Layer-3 Protocol from day 1 BGP
RequiredIS-IS
RequiredPIM-SM
RequiredPIM- SSM
RequiredVRF Lite * Security Feature RA Guard
RequiredDHCP Snooping
RequiredDynamic ARP Inspection
RequiredACL
Required802.1x
RequiredRADIUS/TACACS
RequiredPort Security
RequiredBPDU Guard
RequiredVRF Lite
RequiredIGMP snooping * Management Protocol GUI
RequiredCLI
RequiredTelnet
RequiredTFTP
RequiredSN MPv1
RequiredSNMPv2/V2C
RequiredSN MPv3
RequiredNTP
RequiredOpenflow 1.3
RequiredRMON
RequiredSSHv2 * QoS 802.1p
RequiredSP
RequiredQueues per port
RequiredWRED WTD
RequiredShapincg
RequiredPolicing Rate Limiting * 3/8 PoE Power Budget (Watt) 0 * Dimension/Form Factor (RU) 1 * Certification NDPP
RequiredEAL2 * MTBF (Year) 7 * Minimum Operating Temperature (Degree C) -5 * Maximum Operating Temperature (Degree C) 45 * Minimum Operating Humidity (%RH) 10 * Maximum Operating Humidity (%RH) 95 * IPv6 Ready from day 1 Yes * On Site OEM Warranty (Year) 5 5 Or higher * Specifications highlighted in bold are the Golden Parameters. * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer. Additional Specification Documents