SE-ES
SUPERINTENDING ENGINEER/ ELECTRICAL SYSTEM, NCTPS-I, CHENNAI-120
NCTPS I ES Circle EM II Division SDn II HT LT SWGR Carrying out Time bound works for maintenance overhauling of important critical modules and HT LT breakers in RWPH AHP FOPH AC Plant and Silo for the period of 180 days for the year 2022 23
2022_EB_253824_1
SE ES NCTPS I WC No 68 2022 23
Open Tender
Power/Energy Projects/Products
Works
180 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,800
Yes
18 Oct 2022
28 Sept 2022
12 Oct 2022
28 Sept 2022
11 Oct 2022
28 Sept 2022
Amount
Releasing and cleaning of critical modules, healthiness checking of power Contactor tips and replacing if necessary and terminal tightness of all components and re-fixing the modules in the repective panels. Checking of cable tightness at modules end and motor end, replacing of lugs if necessary for 1 module) LT module – 63 Nos. (Critical modules in AHP, AC Plant, FOPH, Silo SWGR)
Releasing, checking and cleaning of finger contacts in breaker with acetone, healthiness of spring charging motors and mechanisms, tightness checking of all components of breakers and lubrication of all moving parts and checking their operations and re fixing the breakers. Opening of breaker panel back doors, checking cable tightness, cleaning and re fixing etc., for 1 No. LT breaker. (Critical modules in AHP, AC Plant , FOPH, Silo) (AHP – 13 Breakers, FOPH – 3 Breakers, AC Plant – 2 Breakers, Silo – 6 Breakers)
Replacement of spring charge, motor in 6.6 KV HT breaker AHP – 26 Breakers RWPH – 6 Breakers
Replacement of mechanism in 6.6 KV ABB make HT Breaker. AHP – 26 Breakers RWPH – 6 Breakers
Disconnection of power cable, De-coupling the motor from pump and checking alignment (if necessary)
Removal of foundation bolts, lifting the motor to a convenient location
Lifting of motor, placing at motor bed and tightening of foundation bolts, bed bolts etc.,
Charges for cleaning of light jungles and trees around the transformers, 4 pole structure, yard
Checking of Distribution transformer such as Primary / Secondary side terminal tightness checking, changing of bolts & nuts and external cleaning, checking of earth and replacement if necessary and meggering under the supervision of NCTPS officials
Charge for transporting of DM water from DM plant to each battery room in 20 Litres can
Charges for top up of electrolyte for 15 Nos. battery cells (1 Set)
Charges for termination tightness and cleaning for 15 Nos.
Charges for applying petroleum jelly for 15 Nos. battery cells (1 Set)
Charges for discharging of 30V, 100 AH battery set during annual maintenance
Charges for charging of 30 V, 100 AH battery set during annual maintenance
Charges for external weekly cleaning of HT/LT motors, LT switchgear panels, contactor panels, control push button, switchgear and Power transformer in RWPH, AHP, FOPH area
A.R.C.ENGINEERING
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .