| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-Finance | L1 | Accepted-Finance admitted | |
| 2 | L2₹6.6 L+₹6,744.09 (1.04%)Accepted-Finance | L2 | Accepted-Finance admitted | |
| 3 | Rejected-Technical TAMIL NADU | SIVAGANGA | TAMIL NADU | 630301 | - | Rejected-Technical Class IV contractor.PAN Card Xerox not produced. experience certificate not produced. Audited Balance sheet and audited Turn over for past 5 years not produced. Employment of Technical assistant evidence not produced. Vehicele own or lease agreement |
Tender Value
₹6.5 L
EMD Value
₹7,000
Closing Date
22 Jul 2020, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT -SFC MI Tanks and Ponds 2019-20- Mathur Block -2Works- Package No TN-04-KRI-136
2020_RDTN_171104_1
Roc_No_5732_2020_R4_15_06_20
Open Tender
Civil Works - Water Works
Item Rate
180 days
krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,000
DRDA Krishnagiri
7 Aug 2020
11 Jul 2020
22 Jul 2020
11 Jul 2020
22 Jul 2020
11 Jul 2020
13 Jul 2020
Amount
1.Renovation of Chenrayamalai kuttai H/o Salamarathupatti RS.1.28Lakhs
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc.,
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete for channel
Provision for Boundry Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Provision for Name board arrangements
Renovation Muthan kuttai H/o Veerachikuppam RS.5.27Lakhs
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc.,
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete for channel
Construction of weir at Muthan kuttai
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Below ground level
Above ground level
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Construction of Revetment at Muthankuttai
Earthwork excavating and depositing and bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,aying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, aying and curing etc complete for 10 cum.
Rough stone dry packing for appron and revetment using new rough stones including stacking the same for premeasurement etc., complete complying with standard specifications and as directed by the departmental officers
Provision for Name board arrangements
Provision for Boundry Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
GovindaRaj
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .