Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹21.8 L
EMD Value
₹43,680
Closing Date
25 Nov 2026, 1:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE/ MBD
Tinbatti More, Siliguri
Repair of South West Face of Teesta Administrative Building including renovation of toilets at Teesta Administrative Campus under Mahananda Barrage Division, Tinbatti More, Siliguri
2026_IWD_5083048_24
WBIW/EE/MBD/NIT No- 02(e)/ 2026-27
Open Tender
CIVIL WORKS
Percentage
120 days
Tinbatti, Siliguri
Please refer Tender documents.
6 documents required · 6 mandatory
₹43,680
Yes
6 Nov 2026
6 Nov 2026
26 Nov 2026
6 Nov 2026
25 Nov 2026
6 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling artificial stone flooring up to 50 mm thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m
a) In ground floor including roof. | 34.1 | Sqm | 59.59 | ₹2,032.02 |
| 2 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.
In ground floor including roof. | 7.48 | Cum | 2,331.16 | ₹17,437.08 |
| 3 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m
In ground floor including roof.
a) up to 150 mm thick | 2.05 | Cum | 1,119.1 | ₹2,294.15 |
| 4 | Stripping off worn out plaster and racking out joints od walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75 m as directed. | 849.67 | Sqm | 22.64 | ₹19,236.53 |
| 5 | Plaster (to wall, floor, ceiling etc) with sand and cement morter including rounding off or chanfering corners as directed and racking out joints, including throating, nosing and drip course, scaffolding/staging where necessary (Ground Floor). (Excluding cost of chipping over concrete surface).
ii) With 1:4 cement morter.b) 15 mm thick plaster. | 232.95 | Sqm | 182.48 | ₹42,508.72 |
| 5.1 | c) 10 mm thick plaster. | 640.88 | Sqm | 147.14 | ₹94,299.08 |
| 6 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (ii ) River Bazree | 8.18 | Cum | 5,366.98 | ₹43,901.9 |
| 7 | Hire and labour charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (up to roof or ground floor).(When the height of a particullar floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4m height shall be alloued under 12(e) for every 4m or part thereof.) a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge. | 31.3 | Cum | 390.91 | ₹12,235.48 |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking andbending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawingand direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel III. OTHER MANUFACTURERS NOT SPECIFIED | 0.15 | MT | 67,806.31 | ₹10,035.33 |
| 9 | Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment] | 16.88 | Sqm | 931.99 | ₹15,731.99 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.07 MB
Tendernotice_2.pdf
PDF • 0.74 MB
Tendernotice_3.pdf
PDF • 0.04 MB
BOQ_5200810.xls
BOQ • 0.43 MB
24.pdf
Additional Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .