Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | ₹10.1 L | L1 | Accepted-AOC awarded |
| 2 | Rejected-Technical | - | - | Rejected-Technical Qualified |
| 3 | Rejected-Technical | - | - | Rejected-Technical Qualified |
| 4 | Rejected-Technical AFF 3 PROFFESSIONAL VILLA THIRUVALLUVAR NAGAR 1ST STREET KOTTUR CHENNAI 600 085 | CHENNAI | TAMIL NADU | 600085 | - | - | Rejected-Technical Qualified |
Tender Value
₹10.0 L
EMD Value
₹11,000
Closing Date
19 Feb 2026, 3:00 pmClosed
ZONAL OFFICER14
Zonal Officer 14 _No_6_64 Puzhuthivakkam_main_road_Ullagaram_Chennai-91
Z.O. XIV.C.No.E1/1962-3/2026 Attending Road Cut Restoration Work CMWSSB at Pudhu Nagar 4th Street in Dn. 191, Unit-43, Zone-14.
2026_CoC_656232_1
Z.O. XIV.C.No.E1/1962-3/2026
Limited
Civil Works
Works
90 days
ZONE14_CORPORATION_OF_CHENNAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹11,000
30 Mar 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
Earthwork Excavation And Deposting on Bank With In...mall Size Boulders And Hard Gravelly Soil (SS 20A)
Carting away the surplus earth and debris to a lea... Corporation Land as directed during the execution
Providing and laying, spreading and compacting gra...es etc., complete as per clause 406 of MORTH Rev-5
Cold Milling of Existing Asphalt Pavement to a Required Depth And The Milled Surface To Be Cleaned
Providing And Laying. In Position, Standardised Co...The Department For The Excess Usage of Materials).
Providing And Laying Tackcoat Over The Existing Co...plete As Per Clause 503 of Mort &H Specifications.
Providing and laying Bituminous Concrete to 30 mm ...ation using CMP as per clause 507 of MORTH Rev-5
Compatibility Report for ddddggg.
Run on 1/12/2017 16:46
The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format.
Significant loss of functionality
Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear clipped.
'BoQ1'!A1:II17
Minor loss of fidelity
Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned.
Compatibility Report for PERCENTAGE.
Run on 2/8/2017 17:32
The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format.
Significant loss of functionality
Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear clipped.
'BoQ1'!A1:II60
Minor loss of fidelity
Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_786934.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_786934.xls
BOQ • 0.30 MB
1962_3.pdf
Tender Documents • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .