| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.0 L+₹20,073 (7.23%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹3.1 L+₹31,523 (11.3%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Abhinav Enterprises L1 | M/s. AKHYA ENTERPRISES L3 | Perfect Power Transformer Associates L2 |
|---|---|---|---|---|---|---|
| 1.00The following works are carried out for Replacement of Gaskets of 40MVA T/F- 1 (Alstom Make) alongwith other associated Works at 132KV Sub Station Bangarmau, Unnao with all Cost of Men. Misc. Consumables, Crane / Hydra, Centrifuging Machine, Normal & Special T&P's, etc. Required for Satisfactory Completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per Details below: | ||||||
| 2.00 | Removal of Jumpers of HIV & LV side Bushings of the Transformer. The Scope of Work Involves Opening of Bolts & Nuts and Removal of Jumpers, Bushing Clamps etc | 1 | Job | 3,400 ₹3,400 | 7,500 ₹7,500 | 2,000 ₹2,000 Lowest |
| 3.00 | Complete Draining of the T/F Oil from the 40MVA Transformer-ll Into Oil Tanker/Oil Drums and Stacking them at Proper Place. | 1 | Job | 3,900 ₹3,900 | 7,800 ₹7,800 | 2,000 ₹2,000 Lowest |
| 4.00 | Complete Dismantling of the 40MVA Transformer-11. The Scope of Work Involves Dismantling of HV/LV/ Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines, Flanges, 4 Valves, Cooling Fans etc. along with Opening of associated Electrical Connections, Stacking of all the Dismantled Parts at Proper Place in the Switchyard including Proper Blanking of the Open Points before Replacement of Gaskets. | 1 | Job | 16,000 ₹16,000 Lowest | 38,000 ₹38,000 | 25,000 ₹25,000 |
| 5.00 | Complete Replacement of Gasket of 40 MVA Transformer-II. The Scope of Work Involves Removal of old/ damaged Rim Gasket of Transformer's Top Cover and old/ damaged gaskets of different parts of the Transformer by Cleaning of 5 Surfaces. Providing & Fabrication of Gaskets out of good Quality Rubberized Cork Sheet Gaskets of Konica/Troboze/Nu-Cork make having Temperature Bearing Capacity around 380oC and Fixing the Gaskets with Adhesive at Rim & other Surface. | 1 | Job | 99,000 ₹99,000 | 1,05,000 ₹1,05,000 | 80,000 ₹80,000 Lowest |
| 6.00 | Cleaning of Transformer's Core and Winding by Hot Transformer Oil and 6 Removing the Complete Sludge from Bottom by. Flushing with Centrifuging Machine. | 1 | Job | 3,900 ₹3,900 | 25,000 ₹25,000 | 2,000 ₹2,000 Lowest |
| 7.00 | Complete erection of 40 MVA Transformer-ll by erection of HV/LV/Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe Lines, Flanges, Valves, Cooling Fans etc. at its original Place and replacement of damage/defective control cable if required. Complete Evacuation of Main Tank of the Transformer and filling of Dry Nitrogen / Dry Air of Dew Point- 50°C or better in Vacuum upto Pressure of 0.25Kg/cm2 and the again Evacuating the Transformer Tank after Required Time Interval (approx. 12 Hrs) using Centrifuging Machine. The Scope of Work Involves Measuring Due Point Values of N2 after every cycle till the required value is achieved. | 1 | Job | 29,000 ₹29,000 | 21,000 ₹21,000 Lowest | 32,000 ₹32,000 |
| 8.00 | Centrifuging of oil filled in oil tanker, Un-Interrupted till the desired BDV & PPM value of the Oil is achieved, filling of transformer oil into main tank and radiators from oil tanker, then centrifuging & circulation of the oil in transformer, Un-Interrupted till the Desired BDV & PPM values of the Oil & IR Values are achieved including recording of all the parameters such as Temperature, Vacuum, Insulation Resistance etc. every 2 1lours. Centrifuging Machine, it's Operator, all associated T&P's etc. shall be Arranged by the contractor at his own cost. | 21,500 | Ltr. | 1.7 ₹36,550 Lowest | 2 ₹43,000 | 1.9 ₹40,850 |
| 9.00 | Jumpering of IV & LV side Bushings of the Transformer. The Scope of Work 9 involves Fixing & Tightening of Bushing Clamps with appropriate size Bolts - nuts-Washers including Replacement of clamps, jumpers etc. as required. | 1 | Job | 3,800 ₹3,800 | 2,500 ₹2,500 | 2,000 ₹2,000 Lowest |
| 10.00 | Outside complete spray painting of above 40 MVA Transformer-II including its main tank, Main/OLTC Conservator Tank, Radiators, associated pipe Lines, support Structure, Marshalling Box etc by 1 coat of Rd Oxide Primer and then 10 applying 2 coats of Smoke Grey Color 1st Quality Synthetic Enamel Paint of 1 Asian/Berger / Nerolac Make at the Gap of 48 Hirs. Interval each with the help of Spray Painting Machine after due Rubbing & Cleaning of the Rusted Surfaces. Cleaning & Washing of Dust / Dirt/ Oil Deposit from the Surface. | 1 | Job | 21,000 ₹21,000 | 17,500 ₹17,500 Lowest | 25,000 ₹25,000 |
Tender Value
₹4.8 L
EMD Value
₹5,000
Closing Date
5 Jun 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
ETC-II, UPPTCL, PAARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
WORK
2025_UPTCL_1044533_1
E-Tender No. ETC-II/L/10/2025-26
Open Tender
Electrical Works
Item Rate
60 days
ETD
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC-II, UPPTCL, LUCKNOW
₹5,000
11 Sept 2025
30 May 2025
6 Jun 2025
30 May 2025
5 Jun 2025
30 May 2025
Amount
The following works are carried out for Replacement of Gaskets of 40MVA T/F- 1 (Alstom Make) alongwith other associated Works at 132KV Sub Station Bangarmau, Unnao with all Cost of Men. Misc. Consumables, Crane / Hydra, Centrifuging Machine, Normal & Special T&P's, etc. Required for Satisfactory Completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per Details below:
Removal of Jumpers of HIV & LV side Bushings of the Transformer. The Scope of Work Involves Opening of Bolts & Nuts and Removal of Jumpers, Bushing Clamps etc
Complete Draining of the T/F Oil from the 40MVA Transformer-ll Into Oil Tanker/Oil Drums and Stacking them at Proper Place.
Complete Dismantling of the 40MVA Transformer-11. The Scope of Work Involves Dismantling of HV/LV/ Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines, Flanges, 4 Valves, Cooling Fans etc. along with Opening of associated Electrical Connections, Stacking of all the Dismantled Parts at Proper Place in the Switchyard including Proper Blanking of the Open Points before Replacement of Gaskets.
Complete Replacement of Gasket of 40 MVA Transformer-II. The Scope of Work Involves Removal of old/ damaged Rim Gasket of Transformer's Top Cover and old/ damaged gaskets of different parts of the Transformer by Cleaning of 5 Surfaces. Providing & Fabrication of Gaskets out of good Quality Rubberized Cork Sheet Gaskets of Konica/Troboze/Nu-Cork make having Temperature Bearing Capacity around 380oC and Fixing the Gaskets with Adhesive at Rim & other Surface.
Cleaning of Transformer's Core and Winding by Hot Transformer Oil and 6 Removing the Complete Sludge from Bottom by. Flushing with Centrifuging Machine.
Complete erection of 40 MVA Transformer-ll by erection of HV/LV/Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe Lines, Flanges, Valves, Cooling Fans etc. at its original Place and replacement of damage/defective control cable if required. Complete Evacuation of Main Tank of the Transformer and filling of Dry Nitrogen / Dry Air of Dew Point- 50°C or better in Vacuum upto Pressure of 0.25Kg/cm2 and the again Evacuating the Transformer Tank after Required Time Interval (approx. 12 Hrs) using Centrifuging Machine. The Scope of Work Involves Measuring Due Point Values of N2 after every cycle till the required value is achieved.
Centrifuging of oil filled in oil tanker, Un-Interrupted till the desired BDV & PPM value of the Oil is achieved, filling of transformer oil into main tank and radiators from oil tanker, then centrifuging & circulation of the oil in transformer, Un-Interrupted till the Desired BDV & PPM values of the Oil & IR Values are achieved including recording of all the parameters such as Temperature, Vacuum, Insulation Resistance etc. every 2 1lours. Centrifuging Machine, it's Operator, all associated T&P's etc. shall be Arranged by the contractor at his own cost.
Jumpering of IV & LV side Bushings of the Transformer. The Scope of Work 9 involves Fixing & Tightening of Bushing Clamps with appropriate size Bolts - nuts-Washers including Replacement of clamps, jumpers etc. as required.
Outside complete spray painting of above 40 MVA Transformer-II including its main tank, Main/OLTC Conservator Tank, Radiators, associated pipe Lines, support Structure, Marshalling Box etc by 1 coat of Rd Oxide Primer and then 10 applying 2 coats of Smoke Grey Color 1st Quality Synthetic Enamel Paint of 1 Asian/Berger / Nerolac Make at the Gap of 48 Hirs. Interval each with the help of Spray Painting Machine after due Rubbing & Cleaning of the Rusted Surfaces. Cleaning & Washing of Dust / Dirt/ Oil Deposit from the Surface.
Providing and Fixing of Oil Temperature Indicator with 4 switches 10 meters 11 capillary length, Range 0-150°C suitable for 40 MVA (132/33 KV) Transformer.
Providing and fixing of Winding Temperature Indicator with 4 switches 10 meters capillary length, Range 0-150°C suitable for 40 MVA (132/33 KV) Transformer.
Work of removal of old and damaged Winding temprature indicator from 13 transfomer panel by opening the nut of capillary tube and keeping all other connection safe with all men power and T&P.
Work of removal of old and damaged Oil temprature indicator from transfomer 14 panel by opening the nut of capillary tube and keeping all other connection safe with all men power and T&P
Carriage of 20 KL. empty oil tank from 765 KV S/S Unnao to 132 KV S/S Bangarmau, Unnao distance of 65 Km Approx. for transforer oil storeage for 15 replacement of Gaskets of 40MVA T/F-II (Alstom Make). Work also includes carefully loading empty oil tank at 765 KV S/S Unnao and unloading at 132 KV S/S Bangarmau, Unnao.
Carriage of 20 KL empty oil tank from 132 KV S/S Bangarmau, Unnao to 765 KV S/S Unnao distance of 65 Km Approx. Work also includes carefully loading| empty oil tank at 132 KV S/S Bangarmau, Unnao and unloading at 765 KV S/S Unnao.
Perfect Power Transformer Associates (BID ID -5235665)
M/s. AKHYA ENTERPRISES (BID ID -5236455)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .