Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹98,400
Closing Date
18 Aug 2026, 12:30 pm
OHE bonding work in connection to (A)JAJ - BRYA - Yard improvement/upgradation work under ADEN/KEU at station Mankatha, Lakhisarai, Bansipur, Mananpur and Gidhaur yard, (B) BRYA - KOO - Yard improvement/upgradation work under ADEN/MKA at station Mokama, Athmalgola, Bakhtiyarpur & Tekabigha yard, (C) DURE-DDU - Yard improvement/upgradation work under ADEN/BXR at station Gahmer,Bhadaura,Chausa,Dildarnagar,Dumraon,Zamania,Dheena and Darauli yard, (D) KOO - PNBE - Yard improvement/upgradation work under ADEN/L/Patna at station Khusroopur, Patna Saheeb & Gulzarbagh yard, (E) SCY-DURE - Yard improvement/upgradation work under ADEN/L/DNR at station PWS,BTA,KUA,KRS & RPR yard
TRD-DNR-OT-06-26-27
TRD-DNR-OT-06-26-27
Open
Works - General
6 Months
Lakhisarai, Bihar
₹0
₹98,400
17 Jul 2026
17 Jul 2026
4 Aug 2026
A - OHE bonding work in connection to (A)JAJ - BRYA - Yard improvement/upgradation work under
Supply of structure bond (4.75 m) with nut-bolt.
Erection of structure bond (4.75 m) with nut-bolt.
Supply of rail bond (1.5 m) with nut-bolt.
Erection of rail bond (1.5 m) with nut-bolt.
Supply of Inter track bond (5m) with nut-bolt.
Erection of Inter track bond (5m) with nut-bolt.
Supply and erection of MS flat cross bond/Z bond as per RDSO spec. ETI/OHE/P/7000 or latest with nut-bolt.
Supply of Galvanised steel standard steel wire traction bond with lugs duly crimped at both ends (length 3 meter) with nut- bolt.
Erection of Galvanised steel standard steel wire traction bond with lugs duly crimped at both ends (length 3 meter) with nut-bolt.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TP-YardRemodelling_Upgradation.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14_07_2022ACS-1.pdf
ATTACHMENT
2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf
ATTACHMENT
2023_12_21IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_6ACS-61.pdf
ATTACHMENT
2024_12_20IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_8ACS-8.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_1111_compressed.pdf
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018.pdf
ATTACHMENT
ImportantNoticetoBidderAnnexureV.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-3.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf
ATTACHMENT
2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf
ATTACHMENT
2025_01_09IIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_9ACS-9.dt.09.01.25.pdf
ATTACHMENT
2025_03_04RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_10ACS-10_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].