Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC 1 6 FAKIR CHAKRABORTY LANE | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.3 L+₹300.27 (0.04%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹8.3 L+₹800.27 (0.10%)Rejected-Finance 82 1 BECHU CHATTERJEE STREET KOLKATA 700009 | KOLKATA | KOLKATA | WEST BENGAL | 700009 | L3 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
16 Dec 2024, 11:00 amClosed
Executive Engineer SMD PHE Dte
Chetla , Kolkata
Miscellaneous Electrical works with water supply arrangement at Outram Ghat and adjacent area ,Kolkata in connection with Ganga Sagar Mela - 2025
2024_PHED_772024_12
WBPHE/EE/SMD/NIeT-57 of 2024-25
Open Tender
MISC ELECTRICAL WORKS
Item Rate
35 days
Babughat
Please refer Tender documents.
6 documents required · 6 mandatory
₹15,000
3 Apr 2025
2 Dec 2024
18 Dec 2024
2 Dec 2024
16 Dec 2024
2 Dec 2024
Amount
N.B:-All Quoted Rates are inclusive of GST @ 18% + CESS @ 1%
Hiring and Fixing of sodium vapour, flood light, street light, fixture & other accessories with 400 Watt S.V lamp from 06.01.2025 to 18.01.2025 = 13 days. [ 400 watt SV lamp / equivalent LED light have to be used as and where required with required no. of quantity either SV or both]
400 watt ( 13 days x 340 pts )
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts and washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the steel tubular pole
Construction of temp shed 12ft x 10 ft by bamboo structure with walling and G.I. corrugated roof during mela period as per direction of E.I.C.
Supply of submersible pumping machinery for MTU operation purpose including necessary pipe and fittings on hire basis(3 phase Cora]for supply of pouch process water as directed with effect from 05.01.2025 to 18.01.2025
For T.W. No. 1 for MTU supply
For T.W. No. 2 for MTU supply
Supply & installation of control panel for submersible pumping machinery on hire basis from 05.01.2025 to 18.01.2025
Installation of above pump with 75ft column pipe and connection of power line as per direction of EIC.
Making delivery pipe line connection and fitting fixing non return valve, pressure gauge and 1 ½ “ dia 12 ft long GI pipe connection and cable protection including supply of necessary materials required to complete the job
Making safety device nylon rope/GI wire for the above installation on hire basis
Making cable jointing with required materials
Running & maintenance of submersible pump set during mela period by engaging skilled operating staff in 3 shift with supply of necessary sundries from 05.01.2025 to 18.01.2025 = 14 days x 20hrs x 2 nos
Guarding arrangement of the 2 nos. pump motor set in 3 shifts from 05.01.2025 to 18.01.2025
ORIENTAL ENGINEERING CO. (BID ID -5812502)
H.K.DAS & CO. (BID ID -5820216)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .