Loading…
Loading…
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
5 Aug 2026, 2:00 pm
XEN HYDRAULIC DIVISION KISHTWAR
XEN HYDRAULIC DIVISION KISHTWAR
REFER BOQ
2026_PHE_315896_8
e-NIT No. 38 of 2026-27 Dated. 14-07-2026
Open Tender
Civil Works
Percentage
45 days
Kishtwar
REFER NIT
2 documents required · 2 mandatory
₹600
XEN HYDRAULIC DIVISION KISHTWAR
₹20,000
14 Jul 2026
14 Jul 2026
5 Aug 2026
14 Jul 2026
5 Aug 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of HDPE Pipes from nearest store to road side of work for an average distance of 260 km by Mechanical Transport. | - | MT | 2,718.73 | - |
| 2 | Carriage of HDPE pipes from road side to site of work for an avg. distance 06 km by Head Load | - | MT | 2,705.01 | - |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil | - | Cum | 479.3 | - |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed Ordinary Rock | - | Cum | 924.8 | - |
| 5 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed Hard Rock (Blasting prohibited ) | 4.5 | Cum | 2,173 | ₹9,778.5 |
| 6 | Providing and fixing HDPE . pipes complete with G.I. fittings excluding trenching and refilling etc. HDEP PIPE 75 mm | 2,000 | m | 232.75 | ₹4,65,500 |
| 7 | HDEP PIPE 63 mm | 700 | m | 159.6 | ₹1,11,720 |
| 8 | HDEP PIPE 32 mm | 600 | m | 42.56 | ₹25,536 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated Earth in layers not exceeding 20 cm in depth. Deduct for not watering the excavated earth for banking. | - | Cum | 180.55 | - |
| 10 | Labour required for fixing 12mm TMT Steel hooks complete job | 20 | No | 553 | ₹11,060 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_1027108.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].