Loading…
Loading…
Tender Value
₹4.2 L
EMD Value
₹4,237
Closing Date
6 Oct 2026, 5:00 pm
Executive Officer, Sora Municipality
Office of the Executive Officer, Sora Municipality
Construction of Toilet at Modinagar Pir baba in Ward No.-6
2026_ORULB_141487_66
SOROM_06_2026_27
Open Tender
Civil Works - Others
Percentage
90 days
Sora
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹4,237
Yes
25 Sept 2026
25 Sept 2026
7 Oct 2026
25 Sept 2026
6 Oct 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Single under reamed 250 mm dia pile foundation with RCC M20 using 12mm size HGCB Stone chips incluiding cost of boring but excluding cost of MS/Tor steel and labour charges for cutting, bening and binding of steel. | 9 | Nos | 2,661.9 | ₹23,957.1 |
| 2 | Earth work in all kinds of soil within initial lead of 50.00m and 1.5m initial lift including rough dressing and levelling the bed with all labour T&P etc. complete as directed by the Engineer - in Charge. | 16.03 | cum | 306 | ₹4,905.18 |
| 3 | Filling in foundation and plinth with sand well watered , rammed etc including all cost conveyance roalty ,labour and T&P etc. complete as directed by the Engineer - in Charge. | 3.95 | cum | 1,345.31 | ₹5,313.97 |
| 4 | Cement concrete (1:3:6) using 4cm size hard granite crusher broken metal with all cost conveyance,royalty,taxes etc all complete. | 2.25 | cum | 6,209.72 | ₹13,971.87 |
| 5 | Brick work with with Flyash Bricks having crushing strength between 100kg/cm2 to 149kg/cm2 in Cement mortar(1:6) in foundation & plinth. | 10.74 | cum | 4,686.62 | ₹50,334.3 |
| 6.1 | R.C.C. Work with M20 using 20 mm & down grade H.G.C.B.Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement.a)Pile | 1.52 | cum | 7,116 | ₹10,816.32 |
| 6.2 | R.C.C. Work with M20 using 20 mm & down grade H.G.C.B.Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement.b)Plinth Beam | 0.96 | cum | 7,471.2 | ₹7,172.35 |
| 6.3 | R.C.C. Work with M20 using 20 mm & down grade H.G.C.B.Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement.c)Column | 1.13 | cum | 13,946.51 | ₹15,759.56 |
| 6.4 | R.C.C. Work with M20 using 20 mm & down grade H.G.C.B.Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement.d)Lintel | 0.42 | cum | 10,597.05 | ₹4,450.76 |
| 6.5 | R.C.C. Work with M20 using 20 mm & down grade H.G.C.B.Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement.e)Roof Slab | 1.97 | cum | 11,141.54 | ₹21,948.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_610731.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .