Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.6 L
Closing Date
14 Dec 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EX.Engineer irrrigation ompora budgam
EX.Engineer irrrigation ompora budgam
Construction of RCC Channel on Kachber Khul M/O (HAMLOOR) Lani canal. Amount of work. 2.60 lacs (Including deptt supply) nit no. 29/4 of 09/2020(FRESH)
2021_IFC_152217_3
enit34of122021
Open Tender
Civil Works
Item Wise
10 days
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹300
Yes
ExecutiveEngg ID ompora
Yes
15 Dec 2021
9 Dec 2021
15 Dec 2021
9 Dec 2021
14 Dec 2021
9 Dec 2021
270 days
Amount
Eearth work in bulk excavation by mannual ,means over areas ((exceeding 30cm in depth 1.5 m in width as well as 10sqm on plan ) including disposal of excavated edarth earth lead upto 50m and lift uptl 1.5 m as diirected by Engineer-in-charge All kind of soils.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level.a)1:4:8 (1 cement : 4 coarse sand: 8 graded stone agg.40mm nominal size ) crushed.
Providing and laying in position cement concrete of specified grade of reinforced cement concrete excluding the cost of centering shuttering finishing and reinforcement -All work upto plinth level 1:2:4 (1 cement : 2 coarsesand :4 graded stone agg. 20mm nominal size )
Reinforcement for RCC work including straightening cutting, bending , placing in position and binding all complete . Thermo-Mechnically treated bars.
Centring & shuttering including structting propping etc and removal of form for:- a)Retaining walls, return walls, walls (any thickness )IncI attached pilasters buttresses, plinth and string courses fillets etc. a) Foundations, footings, bases of columns etc. for mass concrete walls (any thickness) including attached pilasters, buttress, plinth and string courses rtc.
Carriage of Materials upto Road site of work by Mechanical transport including cost of loading unloading and stacking a)40mm agg av. 28Km
b) 20mm agg av. 28Km
c) sand av. 37km
d) cement/steel from division store av. 14 km
Extra Carriage of Materials from road site to site of work by Mannual labour/ponies including cost of loading unloading and stacking av. 600 mtrs (Head Load). a)40mm agg
b) 20mm agg
c) sand
d) cement
e) steel
ABDUL AHAD GANIE
BASHIR AHMAD
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .