Loading…
Loading…
Tender Value
₹3.3 Cr
EMD Value
₹6.6 L
Closing Date
5 Jun 2026, 3:00 pmClosed
Provision of platform shed at Majerhat, Park Circus, Santoshpur, Tala etc. over Sealdah Division under Divisional Engineer(HQ)/Sealdah.
TN-19-26-27
TN-19-26-27
Open
12 Months
Kolkata, West Bengal
₹0
₹6.6 L
11 May 2026
11 May 2026
22 May 2026
A-Items covering relevant chapters of the Delhi schedule of Rates [Vol.-2] 2021
B-NON SOR ITEMS
Supplying, erecting, fitting and fixing UPVC RW pipe 160mm dia of Supreme or similar brand 1 conforming to IS:13592. Rate includes supplying, fitting, fixing of all fittings such as UPVC RW bend, tee, angle, double junction plain or with door, offset, clamps bobbins etc as needed at site including cost of cement. All works complete in all respect with all leads, lifts etc. as per instruction of site in-charge. Unit Above/
A1-Items covering relevant chapters of the ER-HQ-IR-USSOR 2021-3-Ver 1.
Item Breakup - A-Items covering relevant chapters of the Delhi schedule of Rates [Vol.-2] 2021
Item Breakup - A1-Items covering relevant chapters of the ER-HQ-IR-USSOR 2021-3-Ver 1.
All kinds of soils SEALDAH DIVISION-ENGINEERING/EASTERN RLY Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in c h a r g e . N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Abutment cap, Pier Cap, Inspection Platform & cum Pedestal over Pier cap, Fender wall, Diaphragm wall etc.
Providing and laying Plain Cement Concrete 1:3:6 cum with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer. Boring, providing and installation of bored cast in- situ Reinforced Cement Concrete piles of specified diameter and length below pile cap of specified grade with Design Mix Cement Concrete, using 20mm graded crushed stone aggregate and coarse sand of approved quality, to carry a safe working load not less than specified, concreting by machine batching, machine mixing, scaffolding, using Admixture in approved proportion (as per IS:9103), placing with tremie pipe, chipping off of pile top to remove laitance concrete above cut off level etc., pumping and bailing out water, by percussion drilling using Direct Mud Circulation (DMC) or Bailor and Chisel technique by tripod and mechanical Winch machine, complete in all respect as per approved drawing, specification and direction of the Engineer in charge. Note: 1. Payment for only cement, reinforcement and permanent casing pipe (if any ) shall be made extra. 2. Length of the pile for payment shall be measured up to the bottom of RCC pile cap. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Providing, fabricating and installing permanent MT casing pipe for bored piles for all diameters with specified thickness of steel plate including all labour, materials, tools & complete as per approved drawing & specifications complete in all respect as per the direction of Engineer in charge. Note: Payment shall be made as per the weight of circular plate of casing pipe only. SEALDAH DIVISION-ENGINEERING/EASTERN RLY Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer.
Initial load test up to 50 ton capacity pile Lateral load testing of single pile in accordance with "IS Code of practice IS:2911 (Part-IV) for determining safe allowable lateral load of pile" with all labour, material, tool & plants, equipment, machinery, etc complete as per drawing and specification as directed by the Engineer.
Piles with lateral load capacity of up to 50 ton
Pulse Echo Test (PET) for integrity testing of piles Each with contractor's men, materials and machines. The rate includes cost of Inspection of site, preparation of pile head and any other unforeseen cost required for the test, submission of reports in triplicate as per satisfaction of the Engineer in Charge. Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub-structures, e.g. pier, Sqm abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level Supply and using Cement at Worksite
Ordinary Portland Cement 53 grade of approved MT brands/makes Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Thermo-Mechanically Treated bars of grade Fe- Kg 500D or more of approved brands/makes. Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. 12 022011(022020) Extra over item nos. 022011 to 022014 for cum 22.50 42.07 946.58 executing the work under water and/or liquid mud to compensate all additional arrangements including pumping out water as required. Note: The extra percentage rate is applicable only for the quantity of work executed under water. [RATE = 20%] Total 4817119.74
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-B-LOC.pdf
ATTACHMENT
SHRAMIKKALYAN.pdf
ATTACHMENT
ComlCompliance-IVVVIVIIVIIIIXXI.pdf
ATTACHMENT
CheckList.pdf
ATTACHMENT
ANNEXURE-C-LOC2.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
annexureVIBcontractualturnoverdata.pdf
ATTACHMENT
annexureVIABidsecurity.pdf
ATTACHMENT
Annexure--I_a_I_b_IIIII-TechComp.pdf
ATTACHMENT
tmtbarsdecontrolled.pdf
ATTACHMENT
Annexure-V_VA.pdf
ATTACHMENT
GCCACSUPRO_10.pdf
ATTACHMENT
TenderDocumentChapterI-II.pdf
ATTACHMENT
JPODIGGING.pdf
ATTACHMENT
LetterregardingrecommendedlistofBrands_makeofmaterialsdated03.09.2025.pdf
ATTACHMENT
Cesscharge.pdf
ATTACHMENT
IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_11.pdf
ATTACHMENT
Download all tender documents and submit your bid