Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.9 LAdmitted-Finance | -2.80% | ₹12.9 L | L1 | Admitted-Finance |
| 2 | L2₹13.0 L+₹13,889.08 (1.08%)Admitted-Finance | -1.75% | ₹13.0 L+₹13,889.08 (1.08%) | L2 | Admitted-Finance |
| 3 | L3₹13.0 L+₹17,196.01 (1.34%)Admitted-Finance | -1.50% | ₹13.0 L+₹17,196.01 (1.34%) | L3 | Admitted-Finance |
Tender Value
₹13.2 L
EMD Value
₹26,455
Closing Date
5 Jun 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-06 ke antargat Ward-79 Preetam Nagar me Harish Singh ke ghar se Dr S K Gupta tak, aur Prabhu Dayal Prajapati se Maa Vaishno Store tak sadak aur nali nirmaan karya.
2026_NNAMC_1151453_22
05.06.2026
Open Tender
Civil Works
Percentage
60 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,550
AS PER DOCS
₹26,455
29 Jul 2026
25 May 2026
5 Jun 2026
25 May 2026
5 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of existin enchrochment like ramp, platform etc monolethic structure and inding stacking of materials with all complete work | 165 | Sqm | 51 | ₹8,415 |
| 2 | Earth work cutting/Filling of embankment lead 30 m and up to 1.5 m lift with all complete work (S.I.No.253) | 247.05 | cum | 87.3 | ₹21,567.47 |
| 3 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) | 48.02 | cum | 5,098 | ₹2,44,805.96 |
| 4 | Struck Pointing (1:2) cement sand mortor including all complete work (S.I.No.574) | 388.8 | sqm | 197 | ₹76,593.6 |
| 5 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 98.82 | cum | 1,654.8 | ₹1,63,527.34 |
| 6 | Providing &laying of Rubber molded reflective Zig-Zag 80 mm thick Interlocking tiles of precast compressive strength I.S.I marked. In gray based Including joints filled and bedding 5cm. With local sand leveling dressing of surface required level &slop and also including all materail labour T&p loading unloading stacking cartage and all taxes required for proper completion of work as per MORD specification No.1500 | 745.2 | sqm | 930.3 | ₹6,93,259.56 |
| 7 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) | 5.59 | Cum | 9,300 | ₹51,987 |
| 8 | M.S iron work including cutting bending and praper laying all complete work (S.I.No.504) | 3.07 | qtl | 6,200 | ₹19,034 |
| 9 | Cartage of earth upto 5 km. distance from site with all complete work. | 197.44 | cum | 183.5 | ₹36,230.24 |
| 10 | Providing&fixing of innaguration board with all complete work. | 1 | Job | 7,350 | ₹7,350 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.40 MB
Tendernotice_2.pdf
PDF • 1.50 MB
BOQ_2159017.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .